Change order #44R proposal for fuel oil lines, March 1999 · Box 7DCASNYC-WTC_000171318
Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.931
RFI log cover sheet, Sep 1998 · Box 7DCASNYC-WTC_000166743
Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.
1 shared topics · Same agency, volume and box · similarity 0.929
Change Order #2 proposal for cabinets and countertops, Nov 1998 · Box 7DCASNYC-WTC_000171829
Proposal for change order #2 to install cabinets, countertops, and paneling at the Office of Emergency Management.
1 shared topics · Same agency, volume and box · similarity 0.928
Revised change order #044R for fuel lines, 7 WTC, March · Box 7DCASNYC-WTC_000171758
Revised change order from Ambassador Construction Company detailing costs and scope for supporting and encasing fuel oil lines at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.928
Change order #044R for fuel oil line work, 7 WTC, · Box 7DCASNYC-WTC_000168439
Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.927
RFI log for 7 World Trade Center, revised July 22, · Box 7DCASNYC-WTC_000173761
Log sheet tracking construction inquiries regarding duct offsets and field conditions with pricing responses.
1 shared topics · Same agency, volume and box · similarity 0.924
Memo summarizing Change Order #51 cost changes, Jan 1999 · Box 7DCASNYC-WTC_000171872
Internal memo summarizing net cost changes for shelving height modifications and unit additions at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.920
P&S Industries quote for kitchen appliances, May 1998 · Box 7DCASNYC-WTC_000172309
Quote from P&S Industries listing refrigerators, microwaves, and dishwashers for the Mayor's Office at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.919
Change Order #77 for dam closures, 7 WTC, Apr 1999 · Box 7DCASNYC-WTC_000168456
Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.
1 shared topics · Same agency, volume and box · similarity 0.917
Engineering sketch showing relocated standpipe and piping route · Box 7DCASNYC-WTC_000166828
Technical diagram showing relocated stand pipe and alternative piping routing for emergency management purposes.
Same agency, volume and box · similarity 0.917
Change order #1 for sheetrock work, July 1998 · Box 7DCASNYC-WTC_000173185
Letter submitting change order #1 for $10,817 to install sheetrock wall offsets at the Mayor's Office of Emergency Management.
Same agency, volume and box · similarity 0.916
Letter regarding penthouse siding modification, Nov 1998 · Box 7DCASNYC-WTC_000171926
Letter from Airflex Industrial estimating costs to cut holes in metal siding at the 7 World Trade Center penthouse.