NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd FIoors Change Order #077 Amb. Job #S51-5175
Document / 3 pages

Change Order #77 for dam closures, 7 WTC, Apr 1999

Machine-extracted title · confidence 95%

Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.

NYC-WTC_000168456–000168458

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd FIoors Change Order #077 Amb. Job #S51-5175

Page image
Scanned page image, NYC-WTC_000168456
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ESEIVEh [> I

AMBASSADOR CONSTRUCTION CO., INC. n APR 2 TO _______________ ii

March 31, 1999 Mr. Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York, NY 10048

RE: Mayor’s Office of Emergency Management 7 World Trade Center -1, 7 & 23i d Floors Change Order #077 Amb. Job # S57-5175

Dear Mr. Weems:

We are pleased to submit herewith our change order #077 to perform the following work at the above referenced premises for the sum of TWENTY FOUR THOUSAND TWO HUNDRED SEVENTY FOUR DOLLARS ($24,274.00):

SCOPE OF WORK - Furnish and install two (2) aluminum dam closures where new panel walls abut existing wall system. - Remove existing louver and install continuous flashing and re-install louvers, - Furnish and install all aluminum drip pan @ back concrete curb. Panel & Flashing Work $20,942.00 General Conditions 1,675.00 Overhead & Fee 1,357.00 Insurance 300.00 Total $24,274.00 NOTE; Additional flashing details as per Swanke Hayden Connell’s office sketches 52 and 52A dated 1/29/99 attached.

Please notify us if we are to proceed with this work.

^B^ADOy CONSTRUCTION CO., INC.

WzmX___ Martin Schneider Vice President

MS:am cc: Juan Mejia - SHC Glenn Pymento - DCAS Accepted:______________ Dated: C OFFlCe«M»^.MWWPOOCS'OeM'CO SOEMCOn

317 MADISON AVENUE • NEV7 YORK, NY 10017-212 922 1020 • FAX 212 949 9762

NYC-WTC_000168456

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168456Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171766 · Box 7DCAS

Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171829 · Box 7DCAS

Proposal for change order #2 to install cabinets, countertops, and paneling at the Office of Emergency Management.

Similar indexed content

Compare copies and versions →