NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.3
☕ Buy me a coffee
← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd FIoors Change Order #077 Amb. Job #S51-5175
Document / 3 pages

Change Order #77 for dam closures, 7 WTC, Apr 1999

Machine-extracted title · confidence 95%

Submission of Change Order #77 for $24,274 to install aluminum dam closures and flashing at 7 World Trade Center.

NYC-WTC_000168456–000168458

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd FIoors Change Order #077 Amb. Job #S51-5175”

Page image
Scanned page image, NYC-WTC_000168456
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ESEIVEh [> I

AMBASSADOR CONSTRUCTION CO., INC. n APR 2 TO _______________ ii

March 31, 1999 Mr. Walter Weems Silverstein Properties, Inc. 7 World Trade Center New York, NY 10048

RE: Mayor’s Office of Emergency Management 7 World Trade Center -1, 7 & 23i d Floors Change Order #077 Amb. Job # S57-5175

Dear Mr. Weems:

We are pleased to submit herewith our change order #077 to perform the following work at the above referenced premises for the sum of TWENTY FOUR THOUSAND TWO HUNDRED SEVENTY FOUR DOLLARS ($24,274.00):

SCOPE OF WORK - Furnish and install two (2) aluminum dam closures where new panel walls abut existing wall system. - Remove existing louver and install continuous flashing and re-install louvers, - Furnish and install all aluminum drip pan @ back concrete curb. Panel & Flashing Work $20,942.00 General Conditions 1,675.00 Overhead & Fee 1,357.00 Insurance 300.00 Total $24,274.00 NOTE; Additional flashing details as per Swanke Hayden Connell’s office sketches 52 and 52A dated 1/29/99 attached.

Please notify us if we are to proceed with this work.

^B^ADOy CONSTRUCTION CO., INC.

WzmX___ Martin Schneider Vice President

MS:am cc: Juan Mejia - SHC Glenn Pymento - DCAS Accepted:______________ Dated: C OFFlCe«M»^.MWWPOOCS'OeM'CO SOEMCOn

317 MADISON AVENUE • NEV7 YORK, NY 10017-212 922 1020 • FAX 212 949 9762

NYC-WTC_000168456

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168456Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.958

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171766 · Box 7DCAS

Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.

Similar indexed content

NYC-WTC_000171829 · Box 7DCAS

Proposal for change order #2 to install cabinets, countertops, and paneling at the Office of Emergency Management.

Similar indexed content

Compare copies and versions →