← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center Change Order #044R Amb. Job #S57-5175
Document / 4 pages

Change order #44R proposal for fuel oil lines, March 1999

Machine-extracted title · confidence 95%

Contractor submission of revised change order #44R for fuel oil line supports, enclosures, and new routing at 7 World Trade Center.

NYC-WTC_000171318–000171321

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center Change Order #044R Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000171318
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

'2^^BASSADOR CONSTRUCTION CO., INC.

March 23.1999 Mr. Waiter Weems Silverstein Properties Inc. 7 World Trade Center New York, NY 10048

Re: Mayor’s Office of Emergency Management 7 World Trade Center Change Order #044R Amb.Job#S57-5175

Dear Mr. Weems:

We are pleased to submit herewith our revised change order #044R to perform the following work at the above referenced premises for the sum of EIGHTY FIVE THOUSAND EIGHT HUNDRED NINETY THREE DOLLARS ($85,893.00):

SCOe&OEMfiQBK

As per Swanke Hayden Connell’s revised sketch SK-58, FSK-60 dated 3/19/99 for the work on the fuel oil lines their supports and enclosure all sides.

Support, columns enclosures $36,270.00 Concrete encasernent around pipe 15,650.00 New route for fuel oil lines 12,500.00 . Miscellaneous patching sheetrock & block 5.500.00 Painting 2,500,00 /, V Electrical hook-up for welding __ XSdQJfflDiv' Subtotal $73,920.00 " General Conditions 5,914.00 Overhead & Fee 4,780.00 \ insurance __ i.2ea.DQ 2^5 Total $85,893.00 6

AUftmatei If steel work has to be performed on overtime add $9,458.00

We have not included in this cost any other work on overtime or standby time for this work except for the alternate.

Continued... 317 MADISON AVENUE • NEW YORK, NY 10017 • 212 822 1020 • FAX 212 949 9782

NYC-WTC_000171318

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171318Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

4 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.983

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171766 · Box 7DCAS

Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.

Similar indexed content

Compare copies and versions →