← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center Change Order #044R Amb. Job #S57-5175
Document / 4 pages

Mayor's Office of Emergency Management 7 World Trade Center Change Order #044R Amb. Job #S57-5175

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000171758–000171761
Page image
Scanned page image, NYC-WTC_000171758
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

RPR 06 ’99 11:00 FR RMBASSRDOR CONSTR. C0212 949 976.2 TO 6693640 P.02/08

AMBASSADOR COWSTRUCTION CO., INC,

March 23,1999 Mr. Waiter Weems ■ Silverstein Properties Int. 7 World Trade Center New York, NY 10048

Re: Mayor’s Office of Emergency Management 7 World Trade Center Change Order #044R Amb.Jj3bJ#S57-5.175

Dear Mr. Weems:

We are pleased to submit herewith our revised change order #044R to perform the following work at the above referenced premises for the sum of EIGHTY FIVE THOUSAND EIGHT HUNDRED NINETY THREE DOLLARS ($85,893.00);

SCQPEOFWORK

As per Swanke Hayden Connell’s revised sketch SK-58, FSK-60 dated 3/19/99 for the work on the fuel oil lines their supports and enclosure all sides.

Support, columns enclosures $36,270.00 Concrete encasement around pipe 15,S50.00 New route for fuel oil lines 12,500.00 . Miscellaneous patching sheetrock & block 5,500,00 Painting 2,500,00 Electrical hook-up for welding ™t50QJMv< Subtotal $73,920.00 General Conditions 5,914.00 Overhead & Fee 4,790.00 Insurance 1.2aLD0 Total $85,893.00 6

Alternate; If steel work has to be performed on overtime add $9,458.00

We have not included in this cost any other work on overtime or standby time for this work except for the alternate.

Continued... 317 MADISON AVENUE • NEW YORK. NY 10017 • 212 922 1020 . FAX 212 949 9762

\ NYC-WTC_000171758

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171758Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Change order #044R for fuel oil line work, 7 WTC, · Box 7DCAS

NYC-WTC_000168439

Change order for $85,893 covering support structures, concrete encasement, routing, and patching for fuel oil lines and enclosures at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.973

machine-extracted · confidence unavailable · Check page ↗
Change Order #15 sleeves, 7 WTC, Oct 1998 · Box 7DCAS

NYC-WTC_000168650

Change Order #15 submitted by Ambassador Construction for sleeve installation at the 23rd floor of 7 World Trade Center dated October 8, 1998.

2 shared non-person entities · Same agency, volume and box · similarity 0.955

machine-extracted · confidence unavailable · Check page ↗
Change Order request #1 for OEM work, Jan 1999 · Box 7DCAS

NYC-WTC_000171459

Letter from Computer Floors Inc. dated January 28, 1999, requesting a change order for $4,750 regarding work at the Mayor's Office of Emergency Management.

1 shared non-person entities · Same agency, volume and box · similarity 0.949

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171766 · Box 7DCAS

Cover letter submitting Change Order #44 for $24,307 to install fuel oil piping at 7 World Trade Center.