NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/None
Document / 4 pages

Electrical subcontractor estimate, 7 World Trade Center, January 2000

Machine-extracted title · confidence 70%

Electrical trade subcontractor estimate form for work at 7 World Trade Center with work scope details and cost breakdown.

NYC-WTC_000171506–000171509

Folder label: “None

Page image
Scanned page image, NYC-WTC_000171507
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

■'.JAN. 2'5, 200D 1:39PM SWANKE HAYDEN CONNELL ARCHITECTS, NO. 2046 P, 3/6 Head and Jamb Note: A = Aluminum ' B = Bronze D = Dr. Bronze.Anodized G - Simulated Bronze Anodized Protection-r-Contact Seal Bk= Black Anodized ZERO 08730/ZEH Buy Une 0290

•V I

6 i i @90 #6X.500" SMS 9 I I #6 X .500" SMS

Oosec Cell J? .125" doted Cell I i .125" J# J. Sponge Neoprene

Yl Si J# .188^.750" — issgsv^e^/igi 1 .-------------- T #312A --------- —7- .094" ,094" #314A #314D «312D h .625“ h— i.do- — I #314B #314G #312G I

■V

;4 #6 M .500“ SMS ZX , #6 X.500-SMS if I i i^ ClnZcdl Spo 100 Neoprene U I sponge Cell Neoprene 1788^x1.250" — if .070’ ?

”01^.750" ' L .250" i^ if ■V I T T #50A .094’ #139A 1.00" «189G 1-259' #50D #1390

S3 £4 if 9 ■ I Y. xiC ■ #6 X .750" SMS #6X.750" SMS I I Clo^Cdl ff Closed Cell i .31 A Sponge Neopremle

ay] 1 if if .375^x.75O" ' .312“ if fL if I if

#31BA •7 1----- 1.00' .094' #322A #322G 1150" 1

4 .125’ #322D

-V !? @9 #6 K .750’ SMS ?! 9@®0 ’i I

js JS5 #6X.500" SMS .094" I i J? if !?. if JL if i I t Solid Neoprene >51’b i^ -71 .438“ ?_ »32aA ’Z' L ' 1.00" ___ J

JI #140A I- 1.625" #323B .220“ #3280 Compress-O-Mofic* #328G

Self-Adhesive (PSA) Door Seals—Head and Jamb i Minimum required clearance between floor and frame — 1.26 .185’ .185" [ X>^.250" ! ".azs" ” '-SOO'' I' .563* -I .750" ►! h 1.125"' I -I 1’-.5OOM I

#926N #312N #118 #119 «119W #18eN #137P C osed Cell 34 B. & S. gauge Spring Bronze or Black Neoprene ! Brusti Sponge Neoprene 35 B. & S. gauge Spring Stainless Steel I Self I zxdnguishing 23 NYC-WTC_000171507

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171507Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

RFI log cover sheet, Sep 1998 · Box 7DCAS

NYC-WTC_000166743

Cover sheet for the Request for Information log documenting 37 received RFI items for the 7 World Trade Center project as of September 16, 1998.

Same agency, volume and box · similarity 0.929

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000167290 · Box 7DCAS

Internal memorandum from DCAS regarding space design for the Mayor's Office of Emergency Management at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →