Generator room insulation recommendations memo, Jan 2000

Machine-extracted title · confidence 95%

Memorandum addressed to the Mayor's Office of Emergency Management recommending insulation for the World Trade Center generator room.

NYC-WTC_000171562

Folder label: “7th Fl. Generator room insulation recommendations

Page image
Scanned page image, NYC-WTC_000171562
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

r ■■■ ■■ JAN. 25. 2nb 1:39PM SWANKE HAYDEN CONNELL ARC'HITECTSmW NO. 2046 P. 2/6 I SwANKE Hayden Conneli Architects

I

I I Memorandum i i Project Name anf Address: Project No: S576A Mayor’s ojffics of Emergency Management Project Direct or/Managen 7 World T ade Center Meinhardt/Aliotta New York, New York Client: Silverstein Properties, Inc. Subject; 7^. Fl.Generator room insulation recommendations.

To From Date Prepared Walter We ems III / Silverstein Properties, Inc. Juan M. Mejia January 20,I 2000

I

During our w; through of the generator room, water tank room and the American Express space the following observations where made. b A number )f air infiltration was observed around the intake louvers that need to be packed and caulked. 2- We SUggei t that the blank louvers be insulated from the inside of die room wi± 3 '/z” foiledbacked mineral wool R-19 minimum- 3- Build a sei ond furred out wall in the storage room adjacent to the American express space with foilbacked mtneral wool thermal insulation 1-19 minimum. 4- Add weafl er stripping to the double door entrance. {See attached catalog cut.) ; ,5- Remove n diatpr enclosure and column enclosure and seal all openings where air is infiltrating replace enclosures and paint if required. 6- Furnish ar i install (2) additional electric unit heaters as per attached Cosentini’s memo. In addition to, le above recommendations the following are a list of items requested by the port authority during the final inspection. 1 - Install hea: tracing at existing 6” diameter pipe in 7*^. floor generator room. 2- Add meta asirigal to double doors at 23’‘‘. floor cooling tower mechanical room. 3- Add one r lorc sprinkler head at 1*'. floor (elevator room in front of roll down grill.

If you need an ' information or coordination from our office in the above maners please call. I i

CC; Glen Pyn ento / DCAS JoeAHota/SHCA Martin Si hneider / AC

I iM.\SS70U\OSMDOeS\MEMO^^ALTERWEEM£ 0Oi01-20.DOC

i Swankc Hayden Council Ud.ZSwankc Hayden Connell & Fanners LLP I 29.5 Lafayetle Street. New York, New York 10012 212 226 9696, Fax 212 219 0059 Ii i NYC-WTC_000171562

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171562Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000171513 · Box 7DCAS

Architectural memorandum providing recommendations for insulating the generator room at the Mayor's Office of Emergency Management.

Filed in the same folder

NYC-WTC_000166787 · Box 7DCAS

Record identifier page for a document within the Mayor's Office of Emergency Management collection at 7 World Trade Center.

Similar indexed content

Compare copies and versions →