← Document results/7DCAS/Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #004 REVISED Amb. Job #S57-5175
Document / 3 pages

Revised Change Order #004 for MOEM work, September 1998

Machine-extracted title · confidence 95%

A revised change order detailing scope changes and costs for the Mayor's Office of Emergency Management renovation project.

NYC-WTC_000173274–000173276

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center - 1, 7 & 23rd Floors Change Order #004 REVISED Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000173275
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

*

AMBASSADOR CONSTRUCTION CO, INC.

Mr. Walter Weems September 11, 1998

Page Two...

Hurricane Wall This is in addition to the letter of June 11,1998 (copy attached) O 1. Additional labor and framing for new duct openings. $4,000.00

2. Patch twenty two (22) existing columns; wall runs in front of column. $2,800.00

3. Add 24lf of hurricane partition thru columns. ■$11,000.00 >7000

4. Add layer sheetrock of 200lf to Hurricane wall as shown on Sections 6 and 12 on D-13. $4,300.00

5. Deletion of top of wall. <$15,000.00> 1%0

6. Additional work to furnish material and labor for the steel reinforcement for Blast proof access doors (19) and Blast proof doors (7). 201 pieces of steel plate 8"x8" and wood blocking as per FSK-11. $13,750.00

7. Remove existing column fronts (19), for new location of Hurricane wall. $1,750.00

8. Leak detection system (additional to budget). » 9. Electrical work on Hurricane dampers in ductwork (22) to be connected to the new ASCO #917 from panel ELP-23B1, Furnish and install override switch in watch commander’s station desk with indicator light to be operated manually. Dampers not tied into fire alarm system. $20,700.00 r 10. Additional steel 3"x3" x 5/16" steel angle welded to spandrel as shown on D13. $14,800.00

11. Additional work on Hurricane damper duct to duct refabricating and install new duct four (4) locations. $8,212.00

12. Additional work on Hurricane dampers and fire smoke dampers (15) locations of refabricating and installing new duct. $30,794.00

13. Five (5) locations of Hurricane dampers with flexible connections, additional ductwork as required. $7,305.00

Fonward.../

NYC-WTC_000173275

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173275Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Revised Change Order #004, 7 WTC, Sep 1998 · Box 7DCAS

NYC-WTC_000172050

Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.995

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004, Sept 1998 · Box 7DCAS

NYC-WTC_000173309

Letter from Ambassador Construction submitting a revised change order for work at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.993

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004 for OEM, September 1998 · Box 7DCAS

NYC-WTC_000173810

Letter from Ambassador Construction submitting revised Change Order #004 for oil tank cradle and housekeeping pad work at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.981

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000172050 · Box 7DCAS

Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.

Filed in the same folder

NYC-WTC_000173271 · Box 7DCAS

A revised change order detailing scope changes and costs for the Mayor's Office of Emergency Management renovation project.

Filed in the same folder

NYC-WTC_000173445 · Box 7DCAS

Ambassador Construction submits revised change order for electrical and concrete work at 7 World Trade Center.

Filed in the same folder

NYC-WTC_000173458 · Box 7DCAS

Letter submitting a revised Change Order #004 for concrete and electrical work at 7 World Trade Center.

Filed in the same folder

Compare copies and versions →