AMBASSADOR CONSTRUCTION CO. INC.
Mr. Walter Weems
September 11, 1998
Page Two...
HurricaaeJfl/all
This is in addition to the letter of June 11,1998 (copy attached)
1. Additional labor and framing for new duct openings. $4,000.00 lZ
2. Patch twenty two (22) existing columns; wall runs in front of
column. $2,800.00 V-
3. Add 24if of hurricane partition thru columns. $11,000.00
Auu layer sheetrock of 200lf to Hurricane wall as shown on
Sections 6 and 12 on D-13. $4,300.00
5. Deletion of top of wall. <$15,000.00> I'&'OOf
6. Additional work to furnish material and labor for the steel
reinforcement for Blast proof access doors (19) and Blast
crccf doors (7). 201 pieces of steel >2 plate 8"x8" and wood
blocking as per FSK-11. $13,750.00
7. Remove existing column fronts (19), for new location of
Hurricane wall. $1,750.00 aX
8. Leak detection system (additional to budget). — <11,9?6.00
9. Electrical work on Hurricane dampers in ductwork (22) to
be connected to the new ASCO #917 from panel ELP-23B1,
Furnish and install override switch in watch commander’s
station desk with indicator light to be operated manually.
Dampers not tied into fire alarm system. $20,700.00lZ'
10. Additional steel 3"x3" x 5/16" steel angle welded to
spandrel as shown on DI 3. $14,800.00
11. Additional work on Hurricane damper duct to duct
refabricating and install new duct four (4) locations. $8,212.00
12. Additional work on Hurricane dampers and fire smoke dampers
(15) locations of refabricating and installing new duct. $30,794.00
13. Five (5) locations of Hurricane dampers with flexible connections,
additional ductwork as required. $7,305.00 ’7
Forward.../