AMBASSADOR CONSTRUCTION CO, INC.
♦
Mr. Walter Weems
September 11,1998
Silverstein Properties, Inc.
7 World Trade Center
New York, NY 10048
RE: Mayor’s Office of Emergency Management
7 World Trade Center -1,7 & 23rd Floors
Change Order #004 REVISED
Am b.Job #557-5175
Dear Mr. Weems:
We are pleased to submit herewith our revised change order #004 for the following work in
accordance with the architect’s and engineer’s drawings and specifications marked Bulletin #1
dated 7/24/98 for the sum of TWO HUNDRED NINETY FOUR THOUSAND THREE HUNDRED
THIRTY EIGHT DOLLARS ($294,338.00):
SCOPE OF WORK
1. Delete concrete and reinforcing for new oil tank cradle. <$24.945.00>
2. Ne-w 4" cc.-ciete housekeeping pad under oil tank. • $1,500.00
3. Installation of Graphic annunciator panel see Note #16 Drawing
#E1-23 (FBO) has been eliminated. $0.00
? 4. Change the interrupting capacity of Panel EDPH-23M from
65KA to 10OKA. The coordination of drawings are the
responsibility of the engineer, not the contractors.
5. Furnish, install and wire additional fire alarm devises as per
revised Drawing E4-03 dated 7/24/98. $2,750.00
6. Provide and install additional circuit breakers to Panel EHP-1
and ELP-23W as advised by the engineer. $1,360.00
7. Upgrade the size of ground ictorto 1 #2 in 1 1/4" conduit
as per Drawing #E3;l>H1ated 7/24/98. This was not shown on
the Addendum^ arawings.
Forward...
317 MADISON AVENUE, NEW YORK, NY 10017, 212 922 1020, FAX 212 949 9762