MAYOR'S OFFICE OF EMERGENCY MANAGEMENT
7 WORLD TRADE CENTER
NEW YORK
^BULLETIN #1 (PORT AUTHORITY COMMENTS)
i
Description of work
Ifft I
11
1 Delete concrete and reinforcingfor new oil tank cradle ($ ($24,945.00)
2 New 4" concrete housekeeping pad under oil tank $1,500.00
3 Installation of annunciator panel as per note #16 drawing # E1-23
4 Furnish and install auxiliary contacts in each circuit breaker
of switch board EDPH-23
5 Change switch board EDPH-23 from fuse to circuit breaker
i
ntSirdE]
/ .
.00
i.OO
$0.00
$0.00
$0.00
6 Change the interrupting capacity of panel EDPH-23M from 65KA
to 100KA LOO $3,540.00|
7 F&l additional fire alarm devises as per revised drawing E4-03
dated 7/24/98 $2,750,001
►
8 F&l additional circuit breakers to panel EHP-1 and ELP-23W
as directed by the engineer $1,360.00
9 Upgrade the size of ground conductor to 1#2 in 1 1/4" conduit Bl
as per drawing #E3-01 dated 7/24/98 LOO
I
TOTAL fl i.OO) ($12,105.00)
General conditions 8% 1.60 -$968.40
Sub-total (: 1.60) ($13,073.40)1
Fee 6% .92) ($784.40)
Sub-total 1.52) ($13,857.80)
Insurance 1.25% ($173.22)
GRAND TOTAL !.93) ($14,031.03)