Bulletin #1: Port Authority comments on MOEM work, undated

Machine-extracted title · confidence 95%

A document listing Port Authority comments and associated cost adjustments for the Mayor's Office of Emergency Management renovation.

NYC-WTC_000173277–000173278

Folder label: “Bulletin # 1 (Port Authority Comments)®Sheet 1

Page image
Scanned page image, NYC-WTC_000173277
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Sheen

MAYOR'S OFFICE OF EMERGENCY MANAGEMENT 7 WORLD TRADE CENTER NEW YORK

^BULLETIN #1 (PORT AUTHORITY COMMENTS) i Description of work Ifft I

11 1 Delete concrete and reinforcingfor new oil tank cradle ($ ($24,945.00)

2 New 4" concrete housekeeping pad under oil tank $1,500.00

3 Installation of annunciator panel as per note #16 drawing # E1-23

4 Furnish and install auxiliary contacts in each circuit breaker of switch board EDPH-23

5 Change switch board EDPH-23 from fuse to circuit breaker i ntSirdE] / . .00

i.OO $0.00

$0.00

$0.00

6 Change the interrupting capacity of panel EDPH-23M from 65KA to 100KA LOO $3,540.00|

7 F&l additional fire alarm devises as per revised drawing E4-03 dated 7/24/98 $2,750,001

► 8 F&l additional circuit breakers to panel EHP-1 and ELP-23W as directed by the engineer $1,360.00

9 Upgrade the size of ground conductor to 1#2 in 1 1/4" conduit Bl as per drawing #E3-01 dated 7/24/98 LOO I TOTAL fl i.OO) ($12,105.00) General conditions 8% 1.60 -$968.40 Sub-total (: 1.60) ($13,073.40)1 Fee 6% .92) ($784.40) Sub-total 1.52) ($13,857.80) Insurance 1.25% ($173.22)

GRAND TOTAL !.93) ($14,031.03)

! -- O !

r--

1-- -

Page 2

NYC-WTC_000173277

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173277Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCAS

NYC-WTC_000172034

Cost comparison table for Hurricane Wall work items under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.959

machine-extracted · confidence unavailable · Check page ↗
Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCAS

NYC-WTC_000172020

Cost comparison table for Hurricane Wall work items under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.956

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004, 7 WTC, Sep 1998 · Box 7DCAS

NYC-WTC_000172050

Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.

1 shared non-person entities · Same agency, volume and box · similarity 0.951

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000168669 · Box 7DCAS

Memo submitting revised Change Order #004 for oil tank and electrical panel work at the Mayor's Office of Emergency Management.

Similar indexed content

Compare copies and versions →