NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Bulletin #1 Hurrican Wall- A
Document / 5 pages

Bulletin #1 regarding Hurricane Wall work at 7 World Trade

Machine-extracted title · confidence 95%

Bulletins detailing costs for hurricane wall construction, column reinforcement, and sheetrock installation at the Mayor's Office of Emergency Management.

NYC-WTC_000173408–000173412

Folder label: “Bulletin #1 Hurrican Wall- A

Page image
Scanned page image, NYC-WTC_000173409
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Sheet!

MAYOR'S OFFICE OF EMERGENCY MANAGEMENT 7 WORLD TRADE CENTER NEW YORK 9/14/98

BULLETIN #1 (PORT AUTHORITY COMMENTS)

Ambassador's Ambassador's Description of work Cost Revised Cost

1 Delete concrete and reinforcingfor new oil tank cradle ($19,380) ($24,945)

2 New 4" concrete housekeeping pad under oil tank $1,500 $1,500

3 Installation of annunciator panel as per note #16 drawing # El-23 $0 $0

4 Furnish and install auxiliary contacts in each circuit breaker of switch board EDPH-23 $0 $0

5 Change switch board EDPH-23 from fuse to circuit breaker $0 $0

6 Change the interrupting capacity of panel EDPH-23M from 65KA ~ to 10OKA $7,080 $3,540

_7 F&l additional fire alarm devises as per revised drawing E4-03 dated 7/24/98 $3,205 $2,750

8 F&l additional circuit breakers to panel EHP-1 and ELP-23W as directed by the engineer $1,360 $1,360

9 Upgrade the size of ground conductor to 1#2 in 1 1/4" conduit as per drawing #E3-01 dated 7/24/98 $3,690 $0

TOTAL ($2,545) ($15,795) General conditions 8% ($204) ($1,264) Sub-total ($2,749) ($17,059) Fee 6% ($165) ($1,024) Sub-total ($2,914)1 ($18,082) Insurance 1.25% ($36)1 ($226)

GRAND TOTAL ($2,950) ($18,308)

I - ---- ,—

■ 'T :± - (

i-

I . 1.

. J- _ .

Page 2

NYC-WTC_000173409

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173409Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCAS

NYC-WTC_000172034

Cost comparison table for Hurricane Wall work items under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.

4 shared non-person entities · Same agency, volume and box · similarity 0.991

machine-extracted · confidence unavailable · Check page ↗
Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCAS

NYC-WTC_000172020

Cost comparison table for Hurricane Wall work items under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.

4 shared non-person entities · Same agency, volume and box · similarity 0.990

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004 for OEM, September 1998 · Box 7DCAS

NYC-WTC_000173810

Letter from Ambassador Construction submitting revised Change Order #004 for oil tank cradle and housekeeping pad work at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.949

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →