Memo submitting revised Change Order #004 for oil tank and electrical panel work at the Mayor's Office of Emergency Management.

NYC-WTC_000168669–000168673

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 1, 7 and 23rd Floors Change Order #004 REVISED Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000168672
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I

Sheetl

MAYOR'S OFFICE OF EMERGENCY MANAGEMENT 7 WORLD TRADE CENTER NEW YORK

BULLETIN #1 (PORT AUTHORITY COMMENTS)

Description of work Ambassador's Cost

1 Delete concrete and reinforcingfor new oil tank cradle ($19,380.00) ($24,945.00)

2 New 4" concrete housekeeping pad under oil tank $1,500.00 $1,500.00

3 Installation of annunciator panel as per note #16 drawing # El-23 $0.00 $0.00

4 Furnish and install auxiliary contacts in each circuit breaker of switch board EDPH-23 $0.00 $0.00

5 Change switch board EDPH-23 from fuse to circuit breaker $0.00 $0.00

6 Change the interrupting capacity of panel EDPH-23M from 65KA to 100KA $7,080.00 $3,540.00

7 F&l additional fire alarm devises as per revised drawing E4-03 dated 7/24/98 $3,205.00 $2,750.00

8 F&l additional circuit breakers to panel EHP-1 and ELP-23W as directed by the engineer $1,360.00 $1,360.00

—9- 4Jpgrade-the-sge-of-gTOUDd-condoetoi4&-1#a-in-l i /4" ^-nndi ijt as per drawing #Ej:Q3-dated-Z/a4i‘08 _______________ -—$3,000.99

TOTAL ($2,545.00) ($12,105.00) General conditions 8% -$203.60 -$968.40 Sub-total___________ ($2,748.60) ($13,073.40) Fee 6% ($164.92) ($784.40) Sub-total ($2,913.52)1 ($13,857.80) Insurance 1.25% ($36.42) ($173.22)

GRAND TOTAL ($2,949.93) ($14,031.03)

i

Page 2

NYC-WTC_000168672

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168672Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Revised Change Order #004, 7 WTC, Sep 1998 · Box 7DCAS

NYC-WTC_000172050

Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.989

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004, Sept 1998 · Box 7DCAS

NYC-WTC_000173309

Letter from Ambassador Construction submitting a revised change order for work at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.984

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004 for OEM, September 1998 · Box 7DCAS

NYC-WTC_000173810

Letter from Ambassador Construction submitting revised Change Order #004 for oil tank cradle and housekeeping pad work at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.978

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000173271 · Box 7DCAS

A revised change order detailing scope changes and costs for the Mayor's Office of Emergency Management renovation project.

Similar indexed content

NYC-WTC_000173274 · Box 7DCAS

A revised change order detailing scope changes and costs for the Mayor's Office of Emergency Management renovation project.

Similar indexed content

NYC-WTC_000172050 · Box 7DCAS

Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.

Similar indexed content

NYC-WTC_000173458 · Box 7DCAS

Letter submitting a revised Change Order #004 for concrete and electrical work at 7 World Trade Center.

Similar indexed content

Compare copies and versions →