Revised Change Order #4 Memo, 7 World Trade Center, Sept

Machine-extracted title · confidence 50%

Memo submitting revised Change Order #004 for oil tank and electrical panel work at the Mayor's Office of Emergency Management.

NYC-WTC_000168669–000168673

Folder label: “Mayor's Office of Emergency Management 7 World Trade Center 1, 7 and 23rd Floors Change Order #004 REVISED Amb. Job #S57-5175

Page image
Scanned page image, NYC-WTC_000168673
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Sheen

MAYOR'S OFFICE OF EMERGENCY MANAGEMENT 7 WORLD TRADE CENTER NEW YORK

BULLETIN #1 (HURRICANE WALL-A)

Description of work Ambassador's Cost Revised proposal

1 Additional labour and framing for new duct openings $5,600.00 $4,000.00

2 Patch Twenty two (22) existing columns $3,500.00 $2,800.00

3 Add 24 LF of Hurricane wall thru columns $13,900.00 $9,000.00

4 Add one layer of sheetrock on 200LF of Hurricane wall $4,300.00 $4,300.00

5 Deletion of top of wall approximately 300LF ($14,000.00) ($18,000.00)

6 F&l 201 pieces of 8"x8"x1/2" steel plate reinforcement at 19 blast proof access doors and 7 blast proof doors $14,835.00 $13,750.00

7 Remove existing column fronts at 19 locations $2,500.00 $1,750.00

8 Leak detection system adiitional cost $11,975.00 $0.00

9 Electrical work on Hurricane damper 22 locations $21,800.00 $20,700.00

10 Additional steel 3"x3"x 5/16" welded to spandrel $16,765.00 $14,800.00

11 Additional work on Hurricane dampers duct to duct refabricating and install new duct at 4 locations $8,644.00 $8,212.00

12 Additional work on Hurricane dampers and fire/smoke dampers 15 locations; refabricating and installing new duct $32,415.00 $30,794.00

13 Hurricane damper with flexible connections at 5 locations $7,689.00 $7,305.00

14 Hurricane damper with grill at 32 locations $27,743.00 $26,356.00

15 Hurricane damper above wall at 32 locations $61,565.00 $58,487.00

16 Ruskin dampers Model #CD80AAF4 with 45" water gauge static pressure 88each $64,800.00 $61,560.00

17 10"x10" architectural grills 32 each $4,800.00 $4,560.00

18 Vavcon Hurricane damper actuator in duct work $37,000.00 $35,150.00

I 19 Credit original amount in budget for hurricane wall dampers ($40,000.00) ($40,000.00)

Sub-total $285,831.00 $245,524.00 General conditions 8% $22,866.48 $19,641.92 Sub-total $308,697.48 $265,165.92 Fee 6% $18,521.85 $15,909.96 Sub-total $327,219.33 $281,075.88 Insurance 1.25% $4,090.24 $3,513.45

TOTAL $331,309.57 $284,589.32

Page 1

NYC-WTC_000168673

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000168673Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Revised Change Order #004, 7 WTC, Sep 1998 · Box 7DCAS

NYC-WTC_000172050

Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.989

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004, Sept 1998 · Box 7DCAS

NYC-WTC_000173309

Letter from Ambassador Construction submitting a revised change order for work at 7 World Trade Center.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.984

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004 for OEM, September 1998 · Box 7DCAS

NYC-WTC_000173810

Letter from Ambassador Construction submitting revised Change Order #004 for oil tank cradle and housekeeping pad work at the Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.978

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000173271 · Box 7DCAS

A revised change order detailing scope changes and costs for the Mayor's Office of Emergency Management renovation project.

Similar indexed content

NYC-WTC_000173274 · Box 7DCAS

A revised change order detailing scope changes and costs for the Mayor's Office of Emergency Management renovation project.

Similar indexed content

NYC-WTC_000172050 · Box 7DCAS

Revised Change Order #004 submitted by Ambassador Construction Co. Inc. for $294,338 regarding work at the Mayor's Office of Emergency Management dated September 11, 1998.

Similar indexed content

NYC-WTC_000173458 · Box 7DCAS

Letter submitting a revised Change Order #004 for concrete and electrical work at 7 World Trade Center.

Similar indexed content

Compare copies and versions →