NYC 9/11 Public Portal Document
Sheetl
MAYOR'S OFFICE OF EMERGENCY MANAGEMENT
7 WORLD TRADE CENTER
NEW YORK
BULLETIN #1 (PORT AUTHORITY COMMENTS)
Ambassador's DCAS Ambassador's
Description of work Cost Cost Revised Cost
1 Delete concrete and reinforcingfor new oil tank cradle ($19,380) ($30, M) ($24,945)
2 New 4" concrete housekeeping pad under oil tank $1,500 $1,500 $1,500
3 Installation of annunciator panel as per note #16 drawing # El-23 $0 $0 $0
4 Furnish and install auxiliary contacts in each circuit breaker
of switch board EDPH-23 $0 $0 $0
5 Change switch board EDPH-23 from fuse to circuit breaker $0 $0 $0
6 Change the interrupting capacity of panel EDPH-23M from 65KA
“ to 100KA $7,080 $0 $3,540
7 F&l additional fire alarm devises as per revised drawing E4-03
dated 7/24/98 $3,205 $2,750 $2,750
8 F&l additional circuit breakers to panel EHP-1 and ELP-23W
as directed by the engineer $1,360 $900 $1,360
9 Upgrade the size of ground conductor to 1#2 in 1 1/4" conduit
as per drawing #E3-01 dated 7/24/98 $3,690 $0 $0
TOTAL ($2,545) ($24,850) ($15,795)
General conditions 8% ($204) ($1,988) ($1,264)
Sub-total ($2,749) ($26,838) ($17,059)
Fee 6% ($165) ($1,610) ($1,024)
Sub-total ($2,914) ($28,448) ($18,082)
Insurance 1.25% ($36) ($356) ($226)
GRAND TOTAL ($2,950) ($28,804) ($18,308)