NYC 9/11 Public Portal Document
Sheetl
MAYOR'S OFFICE OF EMERGENCY MANAGEMENT
7 WORLD TRADE CENTER
NEW YORK
BULLETIN #1 (AUDIO VISUAL WORK & EQUIPMENTS)
Ambassador's DCAS Ambassador's
Description of work Cost Cost Revised Cost
1 RF Distribution system
A. Delete 74 (Seventy four) 13" monitors as requested by
Ambassador Construction Co. included included included
2 Press feeds
A. Down grade fiber equipment by reducing the number of feeds
between the Press room and the street. (141,482) (141,482) (141,482),
B. Delete Audio distribution amplifiers for multiple box locations
that are not required (1.747) (174^ (1,747)
C. Eliminate video cable between the EOC and Press room included included included
Fiber distribution system including necessary cables and
switches etc to insure a complete operating system 25,155 25,155 25,155
One (1) rack for transceivers/modulators 300 300 300
3 External video feeds
A. Delete Press video matrix switch for switching and
distribution to multiple modulation that are not required (92,719) (92,719) (92,719)
B. Reduction in cost due to revision of Head-end equipment;
that reduced the number of modulated and re-modulated
channels available for general distribution (39,529) (39,529) (39,529)
TOTAL (250,022) (250,022) (250,022)
General conditions 8% (20,002) (20,002) (20,002)
Sub-total___________ (270,024) (270,024) (270,024)1
Fee 6% 0 (16,201) ______ Oi
Sub-total (270,024) (286,225) (270,024)
Insurance 1.25% 0 (3,578) 0
GRAND TOTAL (270,024) (289,803) (270,024)
t- -
Page 3
NYC-WTC_000172036
OCR can misread numbers and units. Confirm readings against the page image before using them.