Bulletin #1 regarding Hurricane Wall work at 7 World Trade

Machine-extracted title · confidence 95%

Bulletins detailing costs for hurricane wall construction, column reinforcement, and sheetrock installation at the Mayor's Office of Emergency Management.

NYC-WTC_000173408–000173412

Folder label: “Bulletin #1 Hurrican Wall- A

Page image
Scanned page image, NYC-WTC_000173410
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Sheetl

MAYOR'S OFFICE OF EMERGENCY MANAGEMENT 7 WORLD TRADE CENTER NEW YORK 9/14/98

BULLETIN #1 (AUDIO VISUAL WORK & EQUIPMENTS)

Ambassador's Ambassador's Description of work Cost Revised Cost

1 RF Distribution system

A. Delete 74 (Seventy four) 13" monitors as requested by Ambassador Construction Co. included included

2 Press feeds

A. Down grade fiber equipment by reducing the number of feeds between the Press room and the street. (141,482) (141,482)

B. Delete Audio distribution amplifiers for multiple box locations that are not required (1.747) (1,747)

C. Eliminate video cable between the EOC and Press room included included

Fiber distribution system including necessary cables and switches etc to insure a complete operating system 25,155 25,155

One (1) rack for transceivers/modulators 300 300

3 External video feeds

A. Delete Press video matrix switch for switching and distribution to multiple modulation that are not required (92,719) (92,719)

B. Reduction in cost due to revision of Head-end equipment; that reduced the number of modulated and re-modulated channels available for general distribution (39,529) (39,529)

TOTAL (250,022) (250,022) General conditions 8% (20,002) (20,002) Sub-total (270,024) (270,024) Fee 6% 0 (16,201) Sub-total (270,024) (286,225) Insurance 1.25% 0 (3,578)

GRAND TOTAL (270,024) (289,803)

Page 3

NYC-WTC_000173410

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000173410Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCAS

NYC-WTC_000172034

Cost comparison table for Hurricane Wall work items under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.

4 shared non-person entities · Same agency, volume and box · similarity 0.991

machine-extracted · confidence unavailable · Check page ↗
Bulletin #1 cost sheet, 7 WTC OEM, Sep 1998 · Box 7DCAS

NYC-WTC_000172020

Cost comparison table for Hurricane Wall work items under Bulletin #1 at the Mayor's Office of Emergency Management dated September 14, 1998.

4 shared non-person entities · Same agency, volume and box · similarity 0.990

machine-extracted · confidence unavailable · Check page ↗
Revised Change Order #004 for OEM, September 1998 · Box 7DCAS

NYC-WTC_000173810

Letter from Ambassador Construction submitting revised Change Order #004 for oil tank cradle and housekeeping pad work at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.949

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →