NYC-WTC_000128594
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
8 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗A DEP results table showing daily asbestos air monitoring data at 100 Trinity Place from October to November 2001.
NYC-WTC_000132519–000132547
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document wn s r.LinLLVa. .~...... 10/2s/x001: ,15:b4 !AX
personal qualified wear respirators and New York City. 4. Workers will medically . orkers will be licensed by protective equipment for asbestos abatement work. asbestos standards will comply with federal OSHA 5. Personal air monitoring ers will be informed of the test during this plisse standards regarding access to employee exposure obtheme results as required by O informaton. the office spaces be postedto prevent entry into 6. Asbestos warning signs will by unauthorized persons. cted th 7. A double airlock will be co negative Ot au filtration devices. entire office will be kept under protective clothing in the second 8. Workers will remove their outer exiting and placing the contaminated decontamination ti mber before don their protective ge t in a plastic bag. Conversely, workers will the airlocks. (The air entering into clothing and respirator in the ball before blows uncontaminated air through outdoor air and filtration device filters the the airlocks into the work area.) process, smoke tubes will be used to 9. Before beginning the decontamination test the airflow into the chambers. ensure the decontamination areas 10. Aggressive air monitoring will be done to criteria of 70 asbestos and cleaning areas are still below the A1;1ERA phase of operation. structures per cubic centimeter of air after the initial the containment to Constant daily air monitoring will be performed inside within nounal limits. ensure airborne concentrations of asbestos fibers remain outside contamination 11. The windows will be taped and sealed to prevent any remained taped and scaled infiltrating into the workspace. The windows will until exterior of building is cleaned. be tested using micro 12. A representative number of all of the items cleaned will be collected vacuum samples to verify cleanliness. Random samples will surface number of rather than collecting a sample from each item. The samples should be representative of the number and type of items being ASTM D5755-95 criteria of 100 cleaned. Any item above the suggested tested again. The porous structures of asbestos fibers will be cleaned and materials, which cannot be cleaned, should be discarded as asbestos containing waste.
2
NYC-WTC 000132522
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000128594
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
8 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
5 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112048
NYC DEP asbestos inspection report and project notification form submitted for work at 250 Vesey Place.
9 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
29 shared non-person entities · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126757
NYC DEP form submitted to notify the department of an asbestos project at 100 Church Street prior to abatement.
7 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112085
Header page identifying records related to environmental work at 20 Vesey Street.
9 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000122173
Invoice from Fiber Control Inc. for services rendered to the DEP regarding environmental protection.
7 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127238
Invoice from Fiber Control Inc. dated July 18, 2002, detailing charges for facade cleaning services at 143 Chambers Street.
8 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗10 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000126772
NYC DEP form submitted to notify the department of an asbestos project at 100 Church Street prior to abatement.
7 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100522
Cover page for an asbestos project notification form submitted to the New York City Department of Environmental Protection.
10 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117404
NYC DEP Asbestos Project Notification form submitted for an inspection or abatement project at 250 South End Avenue.
8 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000128594
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Similar indexed content
NYC-WTC_000104846
Fax cover sheet transmitting permit application documents for work at 102 and 104 Greenwich Street to the NYC DEP on December 3, 2001.
Similar indexed content
NYC-WTC_000112048
NYC DEP asbestos inspection report and project notification form submitted for work at 250 Vesey Place.
Similar indexed content
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Similar indexed content
NYC-WTC_000126757
NYC DEP form submitted to notify the department of an asbestos project at 100 Church Street prior to abatement.
Similar indexed content