Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125612
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY f. Before leaving the work area all personnel shall remove gross contamination from the outside of their respirators and protective clothing by brushing, vacuuming or wet wiping procedures.

g. Personnel shall proceed to equipment room where they shall remove all protective equipment except respirators.

h. Reusable, contaminated footwear shall be stored in the equipment room when not in use in the work area.

While still wearing respirators personnel shall proceed to the shower area, dean the outside of the respirators and the exposed face area under running water prior to removal of respirator, then shower and shampoo to remove residual asbestos contamination. Filter cartridges must be replaced for each new entry into the work area.

After showering and drying off, workers may proceed to the clean room and don street clothing.

3.0 Waste Container Pass-Out Procedures

These procedures shall be followed during the removal of waste from the work area:

3.1 Asbestos contaminated waste that has been containerized shall be transported out of the work area through the waste container enclosure system (or through the worker decon. enclosure if a separate waste chamber has not been constructed).

3.2 Waste pass-out procedures shall utilize two teams of workers, an "inside" team and an "outside" team.

3.3 The inside team, wearing appropriate protective clothing and respirators shall clean the outside, including bottoms, of properly labeled containers (bags, drums, or wrapped components). Using HEPA vacuums and wet wiping techniques, they shall transport the containers into the waste container pass-out air lock. No worker from the inside team shall further exit the work area through the air lock of the enclosure system.

3.4 The outside team, wearing protective clothing and appropriately assigned respirators, shall enter the air lock from outside the work area, enclose the containers in clean, labeled, 6-mil polyethylene bags or sheeting as the items' physical characteristics demand, and remove them from the air lock to the outside. No worker from the outside team shall further enter the work area through this air lock, which shall be secured to prevent unauthorized entry.

C Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 34

NYC-WTC 000125612

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125612Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →