NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 36/102 GREENWICH STREET Block: 53 Lot: 37 BIN:1001054 104 Greenwich Street
Document / 33 pages

Fax cover sheet from J.C. Broderick & Associates, Oct 2001

Machine-extracted title · confidence 100%

Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.

NYC-WTC_000104853–000104885

Folder label: “102 GREENWICH STREET Block: 53 Lot: 37 BIN:1001054 104 Greenwich Street

Page image
Scanned page image, NYC-WTC_000104862
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

amended water shall be sprayed on as many times and as often as necessary to ensure that the asbestos material is adequately wetted throughout (especially that asbestos nearest the substrate) to prevent dust emission.

1. As a method of organizing the asbestos removal work, workers shall begin working on the areas nearest to the decontamination unit and work towards the HEPA equipped air filtration units. If this is not feasible, the asbestos safety control monitor firm shall approve an alternative to this requirement.

2. The wet material form each section shall be packed and sealed into labeled six mil polyethylene bags and double bagged with visible labels or placed in labeled, leak- proof containers, prior to starting the next section. Water-soaked fallen material shall be picked up while wet.

3. Contaminated material containing sharp edged items shall be cut to manageable size while adequately wet, and then placed in suitable leak tight and puncture-proof containers or wrapped individually into two separate polyethylene sheets and double bagged.

4. Bags and drums shall be marked with the label prescribed by 40 CFR Part 61, Subpart M of the US EPA, 29 CFR 1926 of OSHA, and 49 CFR-Parts 100-199 of the US DOT Hazardous Waste Hauling regulations. The outside of all containers shall be wet-cleaned or HEPA vacuumed before leaving the work area.

5. After completion of this removal phase (stripping), all surfaces from which asbestos has been removed shall be scrubbed using nylon or bristle brushes and wet sponged or cleaned by an equivalent method to remove visible asbestos-containing material. During this work, the surfaces being cleaned shall be kept wet using amended water or a removal encapsulant. All disposable equipment shall be packaged for disposal. Containers shall be washed with amended water or a removal encapsulant and shall have all exterior particulate matter removed prior to removal from the contaminated area.

6. All accessory equipment shall be moved to the equipment room and decontaminated for removal.

i. All free water (in contaminated areas) shall be retrieved and added to asbestos-contaminated waste and/or placed in plastic lined leak-tight drums and/or solidified with an acceptable polymer or it shall be filtered using a five micron filter and disposed of in the sanitary drain, if allowed by local treatment works by regulation or as allowed by permit.

NYC-WTC 000104862

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000104862Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →