Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125633
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY Contractor shall be required to apply and receive approval for r~ variances from the following NYCDEP Asbestos Control Program regulations at a minimum to perform work in compliance with applicable regulations: Sections 1-116(m), 1- 117(a), 1-118(a), 1-126(C).

9.0 General Cleaning Procedures

9.1 Visible accumulations of loose ACM shall be cleaned up as many times as deemed necessary to prevent more than one bag of ACM to accumulate at any time. This material shall be misted until such time as it can be properly cleaned. At the end of each workday care shall be taken that no asbestos containing debris is left overnight in the work area. Materials shall be containerized using non-metallic dustpans or squeegees. HEPA vacuums shall also be utilized to dean debris. Metal shovels shall not be used in the work area to pick up or move accumulated waste material.

9.2 Visible accumulations of dust shall be cleaned of all surfaces in the work area on a daily basis. Wet wiping and/or HEPA vacuuming shall be used for this type of cleaning. The worker DES surfaces shall be cleaned according to this method each day, as appropriate, after each shift change and meal break.

9.3 Excess water accumulation shall be avoided to prevent flooding of the work area. If flooding occurs all work shall stop until the water is collected and

• disposed of properly.

10.0 Final Cleaning Procedures

10.1 Prior to commencement of final air clearance testing, these additional cleaning precautions shall be undertaken to insure the area is ready for clearance testing.

a) After removal of all visible accumulations of ACM, HEPA vacuuming shall be performed on all surfaces. To pick up excess water and gross saturated debris a wet-dry shop HEPA vacuum dedicated to asbestos abatement may be used.

b) All surfaces shall be wet wiped at least once.

c) Upon completion of HEPA vacuum wet wiping, the cleaned layer of surface barriers may be removed. Isolation barriers shall remain in place throughout this operation.

d) The Contractor shall vacate the area and wait a minimum of twelve (12) hours for airborne fibers to settle. At this point, all surfaces shall be cleaned again using wet methods and HEPA vacuums. When this is complete, the remaining plastic barriers shall be removed while the isolation barriers remain in position.

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 55

NYC-WTC 000125633

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125633Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →