NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 74 pages

Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125632
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY equipment not equipped with HEPA filters, shall not be used. ~7 If tent is inside of the building, install two layers of polyethylene sheeting outside and around the window frame and caulking, sealing it to form an airtight barrier between the window and caulking and the exterior of the building. If tent is outside of the building, install two layers of polyethylene sheeting inside and around the window frame and caulking, sealing it to form an airtight barrier between the window and caulking and the interior of the building.

j. All modified tents shall be fully framed (including horizontally across the top, if applicable) with 2x3 (minimum) wood or metal studs spaced not more than 36 inch center-to-center vertically around all sides (except at the entry/exit which shall not exceed 36 inch width). Tents shall be constructed to a size, which Is able to effectively manage the large size of the window frame.

k. All tents shall be lined with 2 layers of plastic sheeting (6-mil thickness at a minimum).

A minimum of one air volume change per 15 minutes through each modified tent shall be maintained.

• m. An airlock having at least 3 feet length between the two curtained doorways shall be constructed at the entrance to each and every tent.

n. Located within each airlock there shall be extra clean and uncontaminated disposable protective suits (e.g., Tyveks), and one such clean suit shall be worn by each worker in the airlock, immediately after removal of the outer suit, before each worker exits any airlock.

o. After tent enclosure successfully passes the Authority's Environmental Consultant Pre-Removal inspection, including smoke testing, the removal of the frame can commence.

p. Remove frame and bag or wrap with one layer of polyethylene and seal airtight within the tent.

q. After the ACM removal and bagging/wrapping, the bagged/wrapped waste shall be HEPA-vacuumed then wet cleaned and transferred into the airlock or into the shower room for double bagging/wrapping, and thereafter the double- bagged/wrapped waste shall be transferred outside the airlock or outside the clean room for its final transfer for storage in an enclosed waste container.

• Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 54

NYC-WTC 000125632

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125632Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →