Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125604
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY

• d. A survey of the work areas at a minimum of once per work shift to ensure that the workers, personalI protective equipment is not ripped or torn and that respiratory protection is worn at all times and that engineering systems used minimize exposure to fibers in the work space are in place.

e. Safe work practices including, provisions for inter-room communications and the exclusion of eating, drinking, smoking and any activity that may break a respiratory protection seal.

f. Proper exit procedures from the wdrk space to the outside through the decontamination facility.

g. Methods for packaging, labeling, I9ading, transporting, and disposing contaminated material in a wa that minimizes exposure and contamination.

h. Emergency evacuation procedures for medical or safety reasons (i.e. fire and smoke) so that exposure to ACM shall be minimized.

Provisions for effective supervisio , including personal air monitoring and any general area air monitorind during the work.

4.0 Notification, Variances, Permits, Warning Signs, Labels, and Posters

4.1 Notifications: The Contractor shall provide required notification to regional, state and local authorities having jurisdiction on the project. The Contractor shall also secure all permits required for the work, including disposal of asbestos In an approved landfill.

4.2 Variances: The Contractor shall be responsible for obtaining any variances to perform the abatement work. The variance request shall be submitted to the owner's Environmental Consultant for approval prior to submission to the NYC-DEP. Payment of fees for the proce ing of any variance request; shall be made by the Contractor.

4.3 Warning Signs, Labels & Posters: The Cjontractor shall erect warning signs around the work space and at every point' of potential entry from the outside at least seven days prior to the start of the work. Signs should be in accordance with OSHA standard 29 CFR 1910.1001. The warning signs shall be a bright color so that they will be easily noticeable. The size of the sign and the size of the lettering shall conform to the OSHA requirements.

The contractor shall Provide the OSHA and NESHAPS required labels for all plastic bags and all drums utilized to transport asbestos contaminated material to the landfill.

The contractor shall provide any other signs, labels, warning and posted • instructions that are necessary to protect, inform and warn people of the hazard from asbestos exposure these shall be Posted in a prominent and

Prepared by JLC Environmental Consultdnts, Inc. Project No. 04-3271 Page 26

NYC-WTC 000125604

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125604Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →