NYC 9/11 Public Portal Document
I
1
SCOPE OF WORK
I
1 110 CHURCH STREET
The abatement work to be performed under this contract consists of the complete removal and
I disposal of all asbestos contaminated dust and the decontamination of all surfaces. All
decontamination and disposal shall be carried out in full and strict accordance with all applicable
I Federal, State and local codes, rules and regulations and with the Contract Documents. All work
shall be performed under modified full containment procedures in accordance with New York
City Department of Environmental Protection Memorandum "Cleanup Of Asbestos Containing
I Materials" dated September 14, 2001 and the Contract Documents. The Contractor is advised
that the gross square footage of the facility is approximately 622,000 square feet.
The Contractor shall provide all union labor, materials and equipment to complete the work as
specified in or contemplated by the Contract Documents, including but not limited to the
following:
I 1. The filing of all required notifications and variances, including the payment of all fees
charged by all regulatory agencies.
I 2. Work area preparation.
I 3. General protection.
4. Isolation and barrier construction.
5. Removal of all asbestos contaminated dust and decontamination of all surfaces within the
limits of this contract.
6. Provide and install personnel and waste decontamination facilities.
I 7. Packaging, transportation and the legal disposal of asbestos contaminated waste.
' 8. Repair or replacement, to the owner's satisfaction, of any existing finishes, construction
or other building components to remain which are damaged during the prosecution of the
work.
I
1
I
I S-1
NYC-WTC 000098616