53 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Preliminary scope of work document for cleaning 114 Liberty Street,
Machine-extracted title · confidence 95%Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
NYC-WTC_000155525–000155603Folder label: “114 LIBERTY 2 OF 2”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
December 17, 2002 114 LIBERTY STREET REMOVAL OF DUST, DEBRIS, AND CONTAMINATED MATERIALS
5. Gross cleaning of the entire area;
6. Removal and proper disposal of all exposed hardwood flooring, followed by gross cleaning of the sub-flooring using HEPA vacuuming and wet wiping techniques;
7. Removal, bagging and disposal, as asbestos contaminated waste, of any in-place carpeting;
8. Fine cleaning of all remaining surfaces.
d. Complete decontamination of the Work Areas (refer to Section 13 for details).
5. Proper clean up, transport, and disposal ofwaste. Waste stream shall be segregated into three categories. All porous items, dust and debris as well as rags and cleaning materials, clothing etc. shall be disposed of as asbestos contaminated waste. All non- porous items (i.e. unlined HVAC ducts, BX electrical cables, hardwood flooring, etc.), following a gross cleaning by the General Contractor, shall be disposed of as construction and demolition waste.
6. If required, Contractor to provide fire/security watch 24-hours, 7-days a week.
7. Contractor shall have a NYS and NYC licensed asbestos abatement supervisor on site at all times while work is being performed. No work will be allowed whenever there is no supervisor on site.
B. Sequence of the work shall be as follows:
Contractor to provide all required signage on all floors (see Sections 07 and 11 of this document). Post permits in locations as required.
2. Contractor to construct centrally located personal and waste decontamination chambers.
3. Contractor to install temporary lighting and power. All electricians to have Restricted Handlers license.
4. Contractor to install isolation barriers over windows, doors, ceiling penetrations, etc. using two layers of 6-mil polyethylene sheeting and sealed with tape, and protect the floor with two layers of 6-mil reinforced polyethylene sheeting and sealed with tape;
5. Contractor to position Air Filtration Devices (AFDs) to obtain negative pressure in the Work Area. Final location to be approved by Ambient Group, Inc. .
6. Where required, Contractor to provide wooden isolation/barriers at staircases, elevators, lobbies, corridors and all areas where opening is greater than 32 square feet to restrict entry to the Work Area and facilitate total isolation. All materials shall bflre retardant.
7. Contractor to construct wooden manifolds at windows to both accept the exhaust from the AFDs and to provide for make-up air via HEPA-filtered, manually controlled dampers. The exterior of the manifolds shall be painted black.
8 AMBIENT GROUP, INC.-2002 SUMMARY OF WORK
NYC-WTC 000155536
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
47 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
48 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155168
Draft cleaning procedures and contract documentation for 114 Liberty with minor revisions, shared with EPA for review and comment.
12 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000138892
Forwarding draft cleaning procedures for 114 Liberty Street to EPA for review and comments.
12 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107169
Letter from DEP responding to an inquiry by enclosing scopes of work for environmental cleanup at 125 Cedar Street.
17 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
14 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000162906
Document tracking the chain of custody for environmental monitoring samples at 114 Liberty Street on February 7, 2003.
14 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107535
Resident request for DEP to perform cleaning and monitoring work at an apartment in Manhattan.
17 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155635
Submission of contract changes to scope documents awaiting final approval and bidder lists.
14 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 114 Liberty Street · 16 pages · confidence 0.70 · verify page 79
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Cited alongside this record in an Ask answer
NYC-WTC_000155460
Submission of a preliminary scope of work document for safely cleaning the 114 Liberty Street building.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000138892
Forwarding draft cleaning procedures for 114 Liberty Street to EPA for review and comments.
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer