53 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 1.000
machine-extracted · confidence unavailable · Check page ↗Preliminary scope of work document for cleaning 114 Liberty Street,
Machine-extracted title · confidence 95%Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
NYC-WTC_000155525–000155603Folder label: “114 LIBERTY 2 OF 2”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Cleaning Procedures For 114 Liberty Street failure to meet the clearance criteria. The clearance air monitoring criteria have been established by the USEPA for this clean up activity (WTC Vicinity). The clearance criteria are as follows: ■ asbestos in air 0.0009 fee PCMe Primary clearance level ■ lead in settled dust <25 gg/ft2 Primary clearance level ■ dioxin in settled dust <4 ng/m^ Primary clearance level ■ fibrous glass in air <0.01 f/cc Secondary clearance level ■ crystalline silica in air 0.5 pg/m^ Secondary clearance level ■ PAHs in settled dust <0.15 mg/m^ Secondary clearance level
(22) After successful clearance monitoring, isolation barriers shall be removed in accordance with the applicable requirements of Title 15, Chapter 1 of the RCNY. (23) The cleaning contractor is not responsible for damage or loss caused by the acts of parties not involved with the cleanup. Resident shall be responsible for the removal of any valuables. If such removal is not feasible, the resident shall notify the Project Monitor in writing (including original receipt, formal appraisal, or estimated value) as to the location, description and value of said item. (24) Disposal of all wastes generated during the cleaning shall be the responsibility of the contractor. All waste generated shall be treated as asbestos-containing material (ACM) with the exception of items that can be cleaned prior to disposal. As specified above, large items may be cleaned and disposed as non-regulated waste with prior authorization by the Department. Transportation and disposal of generated waste shall be in compliance with all applicable rules and regulations.
(25) All work shall be in compliance with all other applicable requirements of Title 15, Chapter 1 of the RCNY. (26) The following table contains special conditions and handling instructions for items in specific units. Items not specifically referenced in this table shall be handled in accordance with the procedures specified in this scope of work and in written documentation provided by residents via DEP.
Floor No. Action Item / Notables A partition/ barrier shall be installed at the damaged north wall._____________________ 4® A partition/ barrier shall be installed at the damaged north wall and ceiling.____________ 3"* Commercial space: The HVAC system, associated ductwork and suspended ceiling shall be removed and discarded.__________________________________________________ The HVAC system and associated ductwork, and stove exhaust ducts shall be removed and 1“ discarded.
(27) Time sheets shall be submitted to DEP on a weekly basis. (28) At the completion of work a final report shall be submitted to DEP. The final report shall include copies of the daily logs (activities and entry/exit logs), waste manifests, etc.
4 of 4
NYC-WTC_000155603
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
48 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗47 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155168
Draft cleaning procedures and contract documentation for 114 Liberty with minor revisions, shared with EPA for review and comment.
12 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155394
Transmission of cleanup and environmental monitoring documentation for 114 Liberty post-WTC dust remediation project.
14 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗Filed elsewhere
NYC-WTC_000138892
Forwarding draft cleaning procedures for 114 Liberty Street to EPA for review and comments.
12 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗12 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗14 shared non-person entities · 1 shared topics · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Buildings in this record
Machine-extracted building matches; verify each source. Buildings, never households.
- 114 Liberty Street · 16 pages · confidence 0.70 · verify page 79
Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000134132
US EPA Region 2 letter dated November 15, 2005, confirming completion of environmental review for abatement plans at 133-135 Greenwich Street.
Cited alongside this record in an Ask answer
NYC-WTC_000134871
EPA Region 2 letter regarding revised environmental work plan submission for two buildings including asbestos, health, and safety assessment components.
Cited alongside this record in an Ask answer