4.0 Special Conditions
0
4.1 The Contractor shall provide labor, materials and equipment to complete the
work as by the Contract Documents, including but not limited to the following:
a. The filing of all required notifications and variances, including the
payment of all fees charged by all regulatory agencies.
b. Work area preparation.
c. General protection.
d. Isolation barrier construction.
e. Removal of all ACM, asbestos contaminated building components and
decontamination of all surfaces.
f. Installation of personnel and waste decontamination facilities.
g. Transportation and disposal of asbestos waste.
i. Re-establishment of all building systems disrupted by the work of this
contract.
j. Repair or replacement, to the Owner's satisfaction, of any existing
finishes, construction or other building components damaged during
the work.
k. Conduct daily inspections of all adjacent spaces and clean up as
required.
4.2 If the Contractor has any questions as to possible errors or omissions In the
Specifications, he shall immediately bring the discrepancy or other question to
JLC's attention in writing and obtain a written decision as to the methods and
materials to be used, before the submission of his bid. Failure to obtain
clarification in writing shall not relieve the Contractor of performing the normal
good practice of the industry.
4.3 All waste generated by the Contractor shall be disposed of as
contaminated waste to a licensed landfill.
4.4 The Contractor shall provide all required plumbing and electrical work,
including temporary connections. The Abatement Contractor shall provide a-- - -- -
temporary electric panel for his equipment and, where required, shall provide
temporary lighting in accordance with all applicable codes and standards.
4.5 Bidders are required to visit the premises prior to the time of submitting
proposals for the work described herein, and thoroughly inspect the conditions
under which the contract Is to be executed. The Contractor is responsible for
field verification of all locations and quantities and determining all varying field
conditions prior to the submission of their bid. Bids should include the removal
of all ACM identified in the specifications and asbestos abatement drawings.
Quantities provided herein are estimates and are meant to include all ACM.
4.6 The Building Owner shall provide water and electric power at each floor and at
the roof. All temporary water connections shall be turned off and all water
• hoses disconnected at the end of the work shift. All wastewater from the
abatement activities shall be pre-filtered, stored in barrels and re-used as
amended water or disposed of as contaminated waste.
Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 6
NYC-WTC 000125584