NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 36/102 GREENWICH STREET Block: 53 Lot: 37 BIN:1001054 104 Greenwich Street
Document / 33 pages

Fax cover sheet from J.C. Broderick & Associates, Oct 2001

Machine-extracted title · confidence 100%

Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.

NYC-WTC_000104853–000104885

Folder label: “102 GREENWICH STREET Block: 53 Lot: 37 BIN:1001054 104 Greenwich Street

Page image
Scanned page image, NYC-WTC_000104859
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

A. INITIAL WORK-SITE AREA PREPARATION

1. The contractor shall provide and post in clearly visible locations, appropriate caution and/or danger signs indicating that asbestos work is being conducted and that unprotected persons should not enter.

2. Employees of the contractor permitted pursuant to Federal, State and local guidelines or persons employed by the building owner who have successfully completed a maintenance/custodial or worker training course approved by the Department of Environmental Protection shall clean with wet cloths and/or with HEPA vacuums as appropriate all objects that can be removed from the work area without disrupting the asbestos-containing material. Objects shall include, but not be limited to, furniture, equipment, drapes, and curtains. The cloths used for cleaning shall be disposed of as asbestos contaminated waste. If the room and objects within it are shown to be uncontaminated by asbestos, then other employees of the building owner or contractor may remove such objects;

3. The contractor shall install or build a decontamination facility in accordance with NYCDEP, Chapter 1, Subchapter F, Part 2. See attachment 1. 4. The contractor shall arrange for shutting down and sealing off all heating, cooling, and ventilating or other air handling systems. However, if approved by the asbestos safety control monitor, the lighting and the receptacles in the work area may be used if these are properly protected by ground fault circuit interrupters and can be adequately cleaned following abatement;

5. The contractor shall establish written emergency procedures to be posted within each work area. These procedures shall include plans for medical emergencies, repair and clean-up following temporary breach of containment barriers.

6. Before removing any asbestos from the work area, the contractor shall ensure that the outer perimeters of the work area have been securely sealed off from the rest of the building.

7. All vertical and horizontal surfaces except those of asbestos containing materials shall be sealed with watertight polyethylene sheeting except as provided in 8 below.

8. The only permissible exception to total enclosure shall be: i. An entrance airlock with showers and a decontamination chamber, ii. A debris removal airlock to permit cleaning and removing asbestos waste; iii. Staircases; and' iv. Controlled makeup air inlets into the work area.

NYC-WTC 000104859

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000104859Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →