NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/2003 E-Mails Sent M Gilsenan
Document / 24 pages

Indoor dust cleaning program Scope of Work, August 2002

Machine-extracted title · confidence 80%

EPA scope of work documents for World Trade Center indoor dust cleaning program monitoring and remediation procedures.

NYC-WTC_000139069–000139092

Folder label: “2003 E-Mails Sent M Gilsenan

Page image
Scanned page image, NYC-WTC_000139090
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Scope of Work B

Application: A visual inspection was performed and large or significant accumulations of dust or debris from the collapse of the WTC was observed in common areas, residences or portions thereof (such as windows, terraces or balconies).

Residents will not be allowed in the work area. Residents may be present in the residence during cleaning m cases where the work area can be isolated by the erection of isolation barriers. In all other appUcations of Scope B it is assumed that residents will not be present in the residence.

1. The cleaning contractor shall meet with EPA or the Project Monitor ifrequested, to discuss site specific procedures for debris removal, isolation of the work space and worker decontamination.

An asbestos project notification form (NYC form ACP-7) shall be submitted, as required by Title 15, Chapter 1 of the Rules of the City of New York (RCNY), directly to the NYC DEP Asbestos Control Program prior to the start of work. NYS DOL notification may also be required.

At least one asbestos supervisor shall be present at each work place (work place is defined in Title 15, Chapter 1 RCNY as the work area and the decontamination enclosure system).

Personal protective equipment including disposable clothing, gloves, and respirators shall be worn during this cleaning activity.

Warning signs shall be posted at the approach to the work area.

A decontamination enclosure system shall be installed at the entrance to the work area. The shower room shall be equipped with at least a 6-foot flexible hose for waste decontamination. A remote holding area with a lockable door for waste shall be located at the site and shall comply with all applicable storage rules and regulations. Waste removal shall not occur during worker shift changes or when workers are showering or changing. An entry/exit log in compliance with the requirements set forth in Title 15, Chapter 1 ofRCNY shall be maintained in the clean room. A remote decontamination enclosure system shall be considered when appropriate, i.e. inability to comply with the provision due to space limitation or other agency rules, such as for compliance with New York City Fire Department egress requirements.

HVAC systems shall be shut down and locked out or isolated locally. The site specific work plan shall provide additional information on the HVAC system and proposed procedures for shutdown or isolation.

Isolation barriers shall be installed with two layers of 6-mil polyethylene sheeting and sealed with tape.

7

NYC-WTC_000139090

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000139090Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →