as tasks are completed to document the progress of the cleaning.
7. The cleaning contractor shall notify the monitoring contractor immediately upon completion
ofthe cleaning. The Monitoring Contractor will conduct a thorough visual inspection to verify
the absence of visible dust accumulations. If dust is observed the cleaning contractor will
reclean as necessary at no additional cost.
8. Air sampling shall be performed by the Monitoring Contractor after the area is free of dust
accumulations as determined by the Monitoring Contractor. The residence will be recleaned
and retested if the clean-up criteria of 0.0009 fibers/cc (PCME measured by TEM) is not
achieved or if determined necessary by EPA. This clean-up criterion may be reevaluated and
revised, if determined necessary based on field conditions and analytical limitations.
9. Any damage or loss that occurs during cleaning is the responsibility of the cleaning contractor.
The cleaning contractor is not responsible for damage or loss caused by the acts ofthird parties
not involved in the cleaning activities.
10. Residents may identify and tag certain furnishings (e.g. carpets and fabric covered furniture) for
disposal rather than cleaning. Disposal of residents’ personal property shall not occur without
prior written authorization by the owner.
11. Disposal ofall wastes generated during the cleaning shall be the responsibility ofthe contractor.
All waste generated shall be treated as asbestos-containing material (ACM). Transportation and
disposal of generated waste shall be in compliance with all applicable rules and regulations.
12. If mold, suspected ACM or peeling, flaking or chalking paint is observed in the work area, the
cleaning contractor shall immediately contact the Monitoring Contractor.