NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 03/E-Mails Hotline M. Gilsenan
Document / 24 pages

Final cleaning and monitoring scopes of work for WTC indoor

Machine-extracted title · confidence 95%

EPA delivers final scopes of work for WTC indoor dust cleaning and monitoring program to DEP.

NYC-WTC_000138805–000138828

Folder label: “E-Mails Hotline M. Gilsenan

Page image
Scanned page image, NYC-WTC_000138825
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

7. The cleaning contractor shall notify the monitoring contractor immediately upon completion ofthe cleaning. The Monitoring Contractor will conduct a thorough visual inspection to verifythe absence ofvisible dust accumulations. If dust is observed the cleaning contractor will reclean as necessary at no additional cost.

8. Air sampling shall be performed by the Monitoring Contractor after the area is free of dust accumulations as determined by the Monitoring Contractor. The residence will be recleaned and retested if the clean-up criteria of0.0009 fibers/cc(PCME measured by TEM) is notachieved or if determined necessary by EPA. This clean-up criterion may be reevaluated and revised, if determined necessary' based on field conditions and analytical limitations.

9. Any damage or loss that occurs during cleaning is the responsibility ofthe cleaning contractor. The cleaning contractor is not responsible for damage or loss caused by the acts of third parties not involved in the cleaning activities.

10. Residents may identify and tag certain furnishings (e.g. carpets and fabric covered furniture) for disposal ratherthan cleaning. Disposal of residents’ personal property shall not occur without prior written authorization by the owner.

11. Disposal ofall wastes generated during the cl eaning shall be tire responsibility ofthe contractor. All waste generated shall be heated as asbestos-uc-ntaining material (ACM). Transportation and disposal of generated waste shall be in compliance with all applicable rules and regulations.

12. Ifmold, suspected ACM or peeling, flaking or chalking paint is observed in the work area, the cleaning contractor shall immediately centart the Monitoring Contractor.

6

NYC-WTC_000138825

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000138825Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →