OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Scope of WorkB

Application: A visual inspection was performed and large or significant accumulations ofdust or debris from the collapse ofthe WTC was observed in common areas, residences or portions thereof(such as windows, terraces or balconies).

Residents will not be allowed in the work area. Residents maybe present in the residence during cleaning in cases where the work area can be isolated by the erection ofisolation barriers. In all other applications of Scope B it is assumed that residents will not be present in the residence.

1. The cleaning contractor shall meet with EPA or the Project Monitor ifrequested, to discuss site specific procedures for debris removal, isolation of the work space and worker decontamination.

2. An asbestos project notification form (NYC form ACP-7) shall be submitted, as required by Title 15,Chapter 1 oftheRulesoftheCityofNew York(RCNY), directly to the NYC DEP Asbestos Control Program prior to the start of work. NYS DOL notification may also be required.

3. At least one asbestos supervisor shall be present at each work place (work place is defined in Title 75, Chapter 1 RCNY as the work area and the decontamination enclosure system).

4. Personal protective equipment including disposable clothing, gloves, and respirators shall be worn during this cleaning activity.

5. Warning signs shall be posted at the approach to the work area.

6. A decontamination enclosure system shall be installed at the entrance to the work area. The shower room shall be equipped i th at least a 6-foot flexible hose for waste decontamination. A remote holding area with a lockable door for waste shall be located at the site and shall comply with all applicable storage rules and regulations. Waste removal shall not occur during worker shift changes or when workers are showoiingcr changing. An uitrjdexit log in compliance with the requirements set forth in Title 15, Chapter 1 of RCNY shall be maintained in the clean room. A remote decontamination enclosure system shall be considered when appropriate, i.e. inability to comply with the provision due to space limitation or other agency mles, such as for compliance with New York City Fire Department egress requirements.

7. HVAC systems shall be shut down and locked out cr isolated locally. The site specific work plan shall provide additional information on the HVAC systen'x and proposed procedures for shutdown or isolation.

8. Isolation barriers shall b e ii istall cd with two 1 ayers of 6-mil polyethylene sheeting and sealed with tape.

7

NYC-WTC_000138826

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000138826Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →