HOUSEKEEPING
Equipment, operational sites, vehicles and
and safe condition. Areas and work areas shall be maintained in
surfaces shall be kept free of debris,
materials and tools, and any other items unnecessg
capable of causing falls, slips and trij
E. FINAL CLEAN-Up
1. The contractor shall first
clean all surfaces in the work area
mist of amended water or removal using a fine spray or
the wet-wiping procedure using encapsulant applied to all surfaces followed by
disposable
disposed of or rinsed thoroughly on a fr cloths. Theses cloths shall be
equency
accumulation of debris. The contractor shall sufficient to eliminate visible
before re-entering the work area to allow all surfaces to dry for 12 hours
begin 2 cleaning.
i• The contractor shall notify the
asbestos safety technician in writing
that a pre-sealant inspection is
requested.
2. After completion of cleaning all
surfaces in the work area and upon
satisfactory pre-sealant inspection the receiving a
surfaces with a sealant. The color of contractor shall spray coat all dried expose
this coat shall be separate and
the underlying substrate. The distinct from
surfaces to be coated shall include
which asbestos-containing materials have surfaces from
been removed (such as ceilings)
polyethylene which has been used to cover and
fixtures and equipment. walls, floors and non-removable
3. The polyethylene sheeting
used to
be carefully removed and rolled up,protect floors, walls, fixtures, equipment shall
and packaged for disposal. Tape with the contaminated portion of the inside,
and any debris shall also be
sealed polyethylene bags labeled disposed on in
asbestos-contaminated waste.
4. Wet clean with amended
water or a removal encapsulant all
ceilings, electric light fixtures and other walls, woodwork,
surfaces. AIlow faces to dry and repeat
procedure. Cloths or sponges used in the
as contaminated waste. cleaning operation shall be disposed
of
5. The polyethylene sheeting
used to
and clean areas such as those in maintain critical barriers between work areas
doorways, windows and it shall be
encapsulant, but not removed until air sprayed with
results have been obtained. monitoring is completed and satisfactory
6. After completion of the
cleaning operations the contractor shall:
i. Notify the asbestos safety
technician that a clean-up inspection
performed to ensure all visible asbestos
has been removed an the are is
dust free;
NYC-WTC 000128569