Fax cover sheet from J.C. Broderick & Associates, Oct 2001

Machine-extracted title · confidence 100%

Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.

NYC-WTC_000104853–000104885

Folder label: “102 GREENWICH STREET Block: 53 Lot: 37 BIN:1001054 104 Greenwich Street

Page image
Scanned page image, NYC-WTC_000104865
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

D. HOUSEKEEPING

Equipment, operational sites, vehicles and work areas shall be maintained in a clean and safe condition. Areas and surfaces shall be kept free of debris, unnecessary materials and tools, and any other items capable of causing falls, slips and trips.

E. FINAL CLEAN-UP

1. The contractor shall first clean all surfaces in the work area using a fine spray or mist of amended water or removal encapsulant applied to all surfaces followed by the wet-wiping procedure using disposable cloths. Theses cloths shall be disposed of or rinsed thoroughly on a frequency sufficient to eliminate visible accumulation of debris. The contractor shall allow all surfaces to dry for 12 hours before re-entering the work area to begin 2nd cleaning.

i. The contractor shall notify the asbestos safety technician in writing that a pre-sealant inspection is requested.

2. After completion of cleaning all surfaces in the work area and upon receiving a satisfactory pre-sealant inspection the contractor shall spray coat all dried expose surfaces with a sealant. The color of this coat shall be separate and distinct from the underlying substrate. The surfaces to be coated shall include surfaces from which asbestos-containing materials have been removed (such as ceilings) and polyethylene which has been used to cover walls, floors and non-removable fixtures and equipment.

3. The polyethylene sheeting used to protect floors, walls, fixtures, equipment shall be carefully removed and rolled up, with the contaminated portion of the inside, and packaged for disposal. Tape and any debris shall also be disposed on in sealed polyethylene bags labeled asbestos-contaminated waste.

4. Wet clean with amended water or a removal encapsulant all walls, woodwork, ceilings, electric light fixtures and other surfaces. Allow faces to dry and repeat procedure. Cloths or sponges used in the cleaning operation shall be disposed of as contaminated waste.

5. The polyethylene sheeting used to maintain critical barriers between work areas and clean areas such as those in doorways, windows and it shall be sprayed with encapsulant, but not removed until air monitoring is completed and satisfactory results have been obtained.

6. After completion of the cleaning operations the contractor shall:

i. Notify the asbestos safety technician that a clean-up inspection performed to ensure all visible asbestos has been removed an the are is dust free;

NYC-WTC 000104865

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000104865Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →