ii. Request fmal air clearance monitoring of the work area.
7. After the work area is found to be in compliance with the acceptance criteria, the
following tasks shall be performed by the contractor:
i. All critical barriers shall be removed and bagged in polyethylene bags
for disposal;
ii. The inside of windows shall be washed;
iii. Any walls, floors, trim, doors, furniture or other items needed during the
work shall be repaired and refinished to match existing.
8. Notice for a final inspection shall be made by the owner or contractor to the
asbestos safety control monitor.
9. Upon receiving a satisfactory final inspection, application for a Certificate of
Completion may be made.
F. GLOVEBAG REMOVAL (Not Applicable)
The following procedures shall be followed for the use of glove bags or other
techniques or work practices approved by the Department which similarly contain
asbestos fibers. The glove bag work area enclosure shall be either an enclosure, built
out of polyethylene sheeting around the glove bag, or the entire room if no enclosure
is built.
The preparation of the work area for glove bag removal shall include the following:
1. A minimum of two persons shall perform a glove bag removal project. A
third person may be required to conduct air monitoring or assist with
supplies.
2. The work area where the technique is to be utilized shall be roped off and
appropriate caution and/or danger signs posted on the perimeter to prevent
unauthorized personnel from entering the work area.
3. All necessary materials and supplies shall be brought into the work area
before any removal begins.
4. One air change very 15 minutes shall be provided I a glove bag work area
enclosure.
5. If no mini-enclosure is established, then the contractor shall arrange for
shutting down and sealing off all electrical, heating, cooling, and
ventilating or other air handling systems.