Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125585
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY

4.7 The Contractor agrees to defend and hold Masterworks Development Corp. and JLC Environmental Consultants, Inc. harmless from any and all fines, levies or penalties. This Includes the cost to defend penalties issued by any jurisdictional authorities as a result of actions or work procedures used by the Contractor or his sub-Contractors or any persons or organizations assisting or employed directly or indirectly by the Contractor.

4.8 No consideration or allowance will be granted for any misunderstanding or discrepancies of work practices or materials used without written permission from the Owner.

SECTION TWO: GENERAL CONDITIONS

1.0 Requirements

1.1 All work under this contract shall be done in strict accordance with applicable Federal, State and Local regulations, standards and codes governing asbestos abatement.

1.2 The most recent edition of applicable regulations, standards, documents or codes shall be in effect. Where conflict among the requirements or with these specifications exists the most stringent requirements shall be utilized.

1.3 Copies of all standards, regulations, codes and other applicable documents, including this Specification shall be made available at all times by the Contractor at the work site in the clean change area of the worker decontamination system.

1.4 The Contractor shall be required to complete all work within a time frame stipulated by the Owner.

1.5 Indoor abatement for all phases of work should occur during regular hours from 8:00 AM to 5:00 PM. Outdoor abatement for all phases of work may occur during daytime hours. Any other -performance of work outside of these hours, including weekends and legal and union holidays will be permitted only upon receipt of permission, in writing, from the Owner.

1.6 The Contractor shall, at the time of delivery, unconditionally own all materials delivered to the job site. The Contractor may not assign any money due, or to become due under this contract, without having received written consent from the Owner(s).

1.7 The Contractor may not assign or sub-contract any of the work to be performed under this contract without having first received written permission from the Owner(s) for all such assignment and/or sub- contracting.

1.8 The Contractor shall guarantee all workmanship and materials free- from- fault or defect for a period of one year from job closeout.

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 7

NYC-WTC 000125585

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125585Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →