NYC 9/11 Public Portal Document
Asbestos Abatement Technical Specifications
For 130 Cedar Street, New York, NY
4.7 The Contractor agrees to defend and hold Masterworks Development Corp.
and JLC Environmental Consultants, Inc. harmless from any and all fines,
levies or penalties. This Includes the cost to defend penalties issued by any
jurisdictional authorities as a result of actions or work procedures used by the
Contractor or his sub-Contractors or any persons or organizations assisting or
employed directly or indirectly by the Contractor.
4.8 No consideration or allowance will be granted for any misunderstanding or
discrepancies of work practices or materials used without written permission
from the Owner.
SECTION TWO: GENERAL CONDITIONS
1.0 Requirements
1.1 All work under this contract shall be done in strict accordance with
applicable Federal, State and Local regulations, standards and codes
governing asbestos abatement.
1.2 The most recent edition of applicable regulations, standards, documents or
codes shall be in effect. Where conflict among the requirements or with
these specifications exists the most stringent requirements shall be utilized.
1.3 Copies of all standards, regulations, codes and other applicable documents,
including this Specification shall be made available at all times by the
Contractor at the work site in the clean change area of the worker
decontamination system.
1.4 The Contractor shall be required to complete all work within a time frame
stipulated by the Owner.
1.5 Indoor abatement for all phases of work should occur during regular hours
from 8:00 AM to 5:00 PM. Outdoor abatement for all phases of work may
occur during daytime hours. Any other -performance of work outside of these
hours, including weekends and legal and union holidays will be permitted
only upon receipt of permission, in writing, from the Owner.
1.6 The Contractor shall, at the time of delivery, unconditionally own all
materials delivered to the job site. The Contractor may not assign any
money due, or to become due under this contract, without having received
written consent from the Owner(s).
1.7 The Contractor may not assign or sub-contract any of the work to be
performed under this contract without having first received written
permission from the Owner(s) for all such assignment and/or sub-
contracting.
1.8 The Contractor shall guarantee all workmanship and materials free- from-
fault or defect for a period of one year from job closeout.
Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 7
NYC-WTC 000125585
OCR can misread numbers and units. Confirm readings against the page image before using them.