Asbestos Abatement Technical Specifications
For 130 Cedar Street, New York, NY
• 1.9 The Contractor will be expected to execute an AIA- 101 Construction
Contract and comply with the applicable standard AIA General and Special
Provisions in addition to these Specifications.
1.10 Storage areas will be assigned to the Contractor for equipment, tools and
materials. No space will be allocated to the Contractor for parking of
automobiles or trucks.
1.11 The Contractor may interrupt no building services without prior written
permission from Owner(s).
1.12 Applicable Federal, State and Local rules and regulations governing
abatement workers training requirements, and the disposal of asbestos
materials are not completely documented in this Specification. The
Contractor and his personnel are required to have read and familiarized
themselves with such rules and regulations. Copies of these regulatory
documents must be kept on the job site until completion of the work.
2.0 Definitions
2.1 Abatement: Procedures to control fiber release from ACM including removal,
encapsulation, enclosure and repair.
2.2 Abatement Activities: all activities from the initiation of work area preparation
• through successful clearance air monitoring to be performed at the
conclusion of an asbestos project or minor project.
2.3 Aggressive Sampling: A sampling method in which the air sampling
technician agitates and makes airborne any settled dust and residual
asbestos fibers through the use of mechanical equipment to stir up settled
dust during the sampling period, thus simulating activity in that area of the
building.
2.4 AIHA: The American Industrial Hygiene Association, 475 Wolf Ledges
Parkway, Akron, Ohio 44311
2.5 Air Lock: A system for permitting entrance and exit while restricting air
movement between a contaminated area and an uncontaminated area. It
consists of two (2) curtained doorways separated by a distance of at least
three .(3) feet such that one (1) passes through one doorway into the air
lock, allowing the doorway sheeting to overlap and close off the opening
before proceeding through the second doorway, thereby preventing flow-
through contamination.
2.6 Air Sampling: The process of measuring the fiber content of a known
volume of air collected during a specific period of time. The procedure
utilized for asbestos follows the NIOSH Standard Analytical Method 7400 or
the provisional method developed by the United States Environmental
- Protection Agency (USEPA), which are utilized for lower detectability and
specific fiber identification.
Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 8
NYC-WTC 000125586
OCR can misread numbers and units. Confirm readings against the page image before using them.