NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 74 pages

Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125587
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY

2.7 Ambient Air Monitoring: Measurement or determination of airborne asbestos fiber concentrations outside of, but in the general vicinity of the work site.

2.8 Amended Water. Water to which a surfactant has been added.

2.9 ANSI: The American National Standards Institute, 1430 Broadway, New York, New York 10018

2.10 Area Air Sampling: Any form of air sampling or monitoring where the sampling device is placed at a stationary location.

2.11 Asbestos: Any hydrated mineral silicate separable into commercially usable fiber, Including but not limited to Chrysotile (serpentine), Amosite (cummingtonite-grunerite), Crocidolite (riebeckite), Tremolite, Anthrophyllite, and Actinolite.

2.12 Asbestos Contaminated Objects: Any objects that have been contaminated by asbestos fibers.

2.13 Asbestos Containing Material (ACM): Pure asbestos or any material containing more than or equal to one (1) percent asbestos by weight.

2.14 Asbestos Containing Waste Material: ACM or asbestos contaminated objects requiring disposal.

2.15 Asbestos Project: Any form of work performed in connection with the alteration, renovation, modification or demolition of a building or structure which will create friable ACM.

2.16 Asbestos Project Air Sampling Technician: Any person who performs air sampling at an asbestos abatement project.

2.17 Asbestos Removal Plan: A plan which will be undertaken as to prevent so

asbestos from becoming airborne in the course of the alteration, renovation, modification of demolition of any building or structure. --- -

2.18 Approved Safety and Health Program: A program that provides training in the handling and use of ACM, details the safety and health risks inherent in such handling and use, discusses methods for minimizing the exposure of workers and the public to asbestos fibers, and includes instruction in applicable Federal, State and Local Laws and Regulations pertaining to asbestos related work.

2.19 ASTM: The American Society for Testing and Materials, 1916 Race Street, Philadelphia, Pennsylvania. 19103

2.20 Authorized Visitor. The client, his representative and any representative of a regulatory or other agency having jurisdiction over the project.

2.21 Background Level Monitoring: A method used to determine airborne

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 9

NYC-WTC 000125587

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125587Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →