Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125588
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY asbestos fiber concentrations inside and outside the work areas of a building • prior to the start of abatement activities.

2.22 Clean Room: An uncontaminated area or room that is part of the worker decontamination enclosure with provisions for storage of workers' street clothes and protective equipment.

2.23 Clearance Air Monitoring: The employment of aggressive sampling techniques using the volume of air collected to determine the airborne concentrations of residual fibers. It is to be performed as the final abatement activity.

2.24 Contractor: The State, any political sub-division of the State, a public authority or any other governmental agency or instrumentality thereof, self employed person, company, unincorporated association, firm, partnership or corporation and any owner or operator thereof, which engages in an asbestos abatement project.

2.25 Curtained Doorway: A device that consists of at least three overlapping sheets of plastic over an existing or temporarily framed doorway. One (1) sheet shall be secured at the top and left side, the second sheet at the top and right side, and the third sheet at the top and left side. All sheets shall have weight attached to the bottom to insure that the sheets hang straight and maintain a seal over the doorway when not in use.

2.26 Decontamination Enclosure System (DES): A series of connected rooms, separated from the work area and from each other by air locks and used for the decontamination of workers, materials and equipment.

2.27 Demolition: The dismantling or razing of a building, including all operations incidental thereto (except for asbestos abatement activities for which a demolition permit from the New York City Building Departments is required).

2.28 Disturb: To alter or change, such as but not limited to the removal, encapsulation, enclosure or repair of ACM.

2.29 Encapsulant (sealant) or Encapsulating Agent: A liquid material which can be applied to an ACM and which temporarily controls the possible release of asbestos fibers from the material by creating a membrane over the surface (bridging encapsulation) or by penetrating into the material and binding its components together (penetrating encapsulant).

2.30 Encapsulation: The coating or spraying of asbestos materials with a sealant/encapsulating agent.

2.31 Enclosure: The construction of air tight walls and a ceiling between the asbestos material and the facility environment, or around surfaces coated with asbestos materials, or any appropriate and approved procedure that prevents the release of asbestos materials.

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 10

NYC-WTC 000125588

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125588Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →