Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125603
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY 1.21 The secured locations for storage of Contractor and Consultant's equipment.

• 1.22 An approved visitor's list if necessary.

1.23 Project schedule with shift times and total number of shifts.

2.0 Progress Meetings and Submittals during the Work

Progress meeting will be held when specifically requested by the Client and will include representatives of the Owner(s), Contractor and Consultant at which time the following shall be discussed and submitted:

a. Security and safety logs showing names of persons entering the work space, date and time of entry or exit, record of any accident, emergency evacuation, any other safety and/or health incident and the documentation of filter changes on respirators, HEPA equipped ventilation units and other engineering controls.

b. Required permits, clearances, licenses, etc.

c. Job progress reports detailing work activities, including review of progress with respect to previously established milestones and schedules, major problems and actions taken, injury reports, equipment breakdown and bulk material and air sampling results conducted by consultant.

d. Submit copies of all current transport manifests, trip tickets and •

disposal receipts for all asbestos waste materials removed from the work area during the abatement process. i

e. Submit copies of all MSDS as required under the OSHA Hazard Communication Act OSHA 1900.1200.

3.0 Standard Operating Procedures

A written description of Contractor's standard operating procedures for completing the work shall be submitted to ensure maximum protection and safeguard from asbestos exposure to workers, visitors, employees and the environment. The standard operating procedure shall consist of:

a. Methods to maintain security to prevent unauthorized entry into the work space.

b. Maintenance of an entry log record that ensures that the Contractors' personnel are in accordance with the NYS and NYC regulations.

C. Proper protective clothing and respiratory protection use prior to entering the work area. Safe practices to prevent accidents in the work space, especially from electrical shocks, slippery surfaces and entanglements in loose hoses and equipment.

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 25

NYC-WTC 000125603

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125603Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →