NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 74 pages

Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125602
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY information to the examining physician regarding unusual conditions in the • work place environment (e.g., high terr~peratures, humidity and chemical contaminants) that may impact on the employees' ability to perform work activities.

1.7 A copy of the Contractor's and all Sub-Contractors' insurance certificates.

1.8 Manufacturer's certification that HEPA vacuums, required HEPA equipped ventilation units and other local exhaust ventilation equipment conform to ANSI Z9.2-79.

1.9 When rental equipment is to be used in abatement area or to transport asbestos contaminated waste, a written notification concerning intended use of the rental equipment must be provided to the rental agency with a copy submitted to the Owner(s)

1.10 MSI-IA/NIOSH approval documents for Iall respiratory protective devices utilized on site, including manufacturer certification of HEPA filtration capabilities for all cartridges and filters

1.11 Respiratory system information, including manufacturer's literature describing the air supply system and illustrating that it meets the specifications on supplying Grade "D" breathing air.

1.12 Copies of the Contractor's training program, safety manuals and policies, and his written respiratory protection program.

1.13 Standard operating procedure showing how workmen, visitors and Owner's employees will be protected from exposure, how space outside the work areas will be protected from contamination through completion of work, work procedures utilized during the project and final clean-up/decontamination procedures to be implemented.

1.14 The system, warning signs and labels for bags and drums.

1.15 Fire and emergency evacuation plan.

1.16 Plan for communication system between work area and outside (if necessary).

1.17 . Engineering systems for exposure control showing the number, location and capacity of air supply and exhaust systei`ns, the expected direction of flow and the maximum and minimum negative pressure allowed for each work area.

1.18 A list of equipment planned for use during this project, including manufacturer's literature and certifications if appropriate.

1.19 The Identification of encapsulant and material safety data sheets (MSDS).

is 1.20 The telephone location with ready access.

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 24

NYC-WTC 000125602

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125602Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →