NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
13 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
NYC-WTC_000154680–000154700Folder label: “Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Church”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
1. The Abatement Contractor shall bring only properly decontaminated and cleaned equipment to the worksite for use. Contaminated equipment will not be allowed on the site.
2. All equipment (ladders, scaffolds, negative air units) shall be properly decontaminated and/or wrapped and sealed in two layers of 6-mil polyethylene sheeting prior to removal from the Work Area(s).
B. Abatement Materials Requirements: Include but are not limited to:
1. Wetting agent: A mixture of (50% Polyoxyethylene Ester and 50% Polyoxyethylene Ether) in a concentration of 1 ounce to 5 gallons of water. The Abatement Contractor must submit a material data safety sheet on the product used to the Client. 2. HEPA Vacuums: The system shall be in proper working order and provide filtration to 99.97% for particles with a mean aerodynamic diameter greater than 0.3 pm. In addition, the Abatement Contractor shall have on hand appropriate attachments for cleaning floors, crevices, etc. 3. Polyethylene Sheeting: Shall be of a 6-mil minimum thickness, fire retardant and in a size appropriate to minimize seams and non-movable equipment. 4. Polyethylene Bags (6-mil minimum thickness): To provide air/water tight seal for disposal of waste material and labeled in accordance with OSHA Regulation 29 CFR 1926.58K(2) and current NESHAPS Regulations Section 61.150(v) and all applicable USDOT regulations. 5. Appropriate tools: For scraping and removing all asbestos waste from the removal site, (i.e., scrapers, tin-snips, plastic shovels) 6. Tape/glue: High quality duct tape and spray adhesive glue to adequately maintain an airtight seal.
7. Hand power tools shall be equipped with HEPA filtered local exhaust ventilation.
C. Electrical Equipment: 1. The Abatement Contractor shall provide all equipment, including extensions and temporary lighting, needed to perform his work. Electrical isolation of all work areas shall be performed by the on-site electrical contractor.
2. All electrical work shall be performed by the on-site electricians in compliance with the most recent edition of the National Electric Code, unless otherwise provided by OSHA regulations.
3. The non-current carrying metal parts of fixed, portable and plug-connected equipment shall be grounded. Portable tools and appliances protected by an 10
NYC-WTC_000154693
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
13 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
11 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104853
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
10 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112116
NYC DEP emergency notification form documenting an urgent asbestos abatement situation at 250 Vesey Place requiring immediate action.
10 shared non-person entities · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127792
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
16 shared non-person entities · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
9 shared non-person entities · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102548
NYC DEP asbestos project notification form for inspection and abatement activities at 114 Liberty Street.
7 shared non-person entities · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
12 shared non-person entities · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128594
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
8 shared non-person entities · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
15 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗15 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000126593
Document outlining minimum contractor requirements for asbestos abatement work at 100 Church Street.
Similarity score 0.969 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
Similarity score 0.967 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similarity score 0.964 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Similarity score 0.963 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.963 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.962 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000105899
Scope of work document dated September 20, 2001, for emergency cleanup at 217 Broadway.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000110954
Asbestos project notification form for an inspection at 3 World Financial Center.
Cited alongside this record in an Ask answer
NYC-WTC_000115257
Agreement between the City of New York and a landowner for the removal of foreign debris from exterior areas of 212 Pearl Street.
Cited alongside this record in an Ask answer