NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
13 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.
NYC-WTC_000154680–000154700Folder label: “Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Church”

OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
approved system of double insulation need not be grounded. All light and power circuits in asbestos removal areas shall be ground fault protected.
4. Extension cords shall be the 3-wire type, shall be protected from damage, and shall not be fastened with staples, hung from nails, or suspended from wires. Splices shall have soldered wire connections with insulation equal to the cable. Worn or frayed cords shall not be used.
5. Safe lighting equipment shall be provided with a preference for floodlights rather than indiscriminate use of unprotected lamps strung on temporary wiring. Exposed bulbs shall be guarded to prevent accidental contact. Temporary wiring shall be properly insulated and substantially supported. Circuits shall be properly designed and fused. All temporary lighting inside of asbestos removal areas shall be waterproofed. Adequate lighting will be provided for the decontamination unit on the “A” level.
6. Receptacles for attachment plugs shall be approved, concealed contact type. Where different voltages, frequencies, or types of current are supplied, receptacles shall be of such design that attachment plugs are not interchangeable.
D. Ladders, Scaffolds and/or Staging: 1. The Asbestos Contractor shall supply OSHA-approved ladders, scaffolds and staging in sufficient quantity to ensure that all work surfaces can be easily and safely reached by workers and inspectors. Scaffolding may be suspension type or standing type and must comply with all applicable federal, state and local regulations and codes.
2. During the use of the scaffolding inside the Work Area(s), special care must be taken to ensure that protective barriers are not damaged. Scaffolding joints and ends shall be sealed with tape to prevent contamination with asbestos fibers and debris.
E. Air Filtration Equipment; 1. The air filtration equipment chosen for the project shall be operated in accordance with and meet the standards specified in the ERA Guidance Document (ERA 560/5-85-024, June 1985, Appendix J), ANSI Z9.2 (1979) Local exhaust ventilation, OSHA CFR29 1910.1001 (June 20, 1986).
2. Air filtration shall be continually maintained throughout the project. Sufficient spare units must be maintained inside and outside the Work Areas as indicated in Section 2.7.
F. Airless Sprayer: 11
NYC-WTC_000154694
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
13 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098577
Contract specifications outlining site decontamination and asbestos disposal procedures for 53 Park Place.
11 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104853
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
10 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112116
NYC DEP emergency notification form documenting an urgent asbestos abatement situation at 250 Vesey Place requiring immediate action.
10 shared non-person entities · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127792
NYC DEP Asbestos Project Notification form for abatement activities at a facility in the Phase 1 Decontamination Plan binder.
16 shared non-person entities · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
9 shared non-person entities · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102548
NYC DEP asbestos project notification form for inspection and abatement activities at 114 Liberty Street.
7 shared non-person entities · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098612
Contract specifications outlining site decontamination and asbestos disposal procedures for 110 Church Street.
12 shared non-person entities · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128594
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
8 shared non-person entities · similarity 0.972
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155525
Initial draft of the comprehensive scope of work required to safely clean 114 Liberty Street following environmental damage.
15 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗15 shared non-person entities · 1 shared topics · similarity 0.971
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000128550
Asbestos inspection report notification form submitted to NYC DEP for 102-104 Greenwich Street.
Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000104853
Facsimile cover sheet transmitting documents regarding environmental work at 102 Greenwich Street.
Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000125579
Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.
Similarity score 0.954 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000146129
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
Cited alongside this record in an Ask answer
NYC-WTC_000105899
Scope of work document dated September 20, 2001, for emergency cleanup at 217 Broadway.
Cited alongside this record in an Ask answer
Cited alongside this record in an Ask answer
NYC-WTC_000110954
Asbestos project notification form for an inspection at 3 World Financial Center.
Cited alongside this record in an Ask answer
NYC-WTC_000115257
Agreement between the City of New York and a landowner for the removal of foreign debris from exterior areas of 212 Pearl Street.
Cited alongside this record in an Ask answer