Asbestos project notification form for NYC DEP

Machine-extracted title · confidence 95%

Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.

NYC-WTC_000154680–000154700

Folder label: “Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Church

Page image
Scanned page image, NYC-WTC_000154695
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

The Asbestos Contractor shall supply airless sprayers of sufficient type and quantity to keep the area spray misted at all times and to adequately wet down all asbestos material.

G. Waste Water Filtration System: The wastewater filtration system must be capable of filtration to Sum via a series of filters with progressively smaller pore sizes.

H. Waste Disposal Equipment: Carts: Plastic leak-tight carts of sufficient quantity shall be provided by the Abatement Contractor in order to safely, discreetly and efficiently transport the materials through the building to the dumpster. Double-bagged ACM shall be covered with 6-mil polyethylene sheeting while being transported from the worksite to the dumpster.

5. CONTRACTOR’S RESPONSIBILITIES The Abatement Contractor shall be responsible for, but not be limited to, the following:

A. Maintaining certified fire-watch personnel as required by NYC regulations and/or the Client’s requirements.

B. Construction of the “A” level decontamination units, with lockable doors and construction barriers and other rigid enclosures.

C. All costs incurred as the result of the failure of clearance testing, including but not limited to additional air sampling costs.

D. Employee personal air monitoring.

E. Any time lost as a result of labor disputes.

F. GFI panels.

G. Temporary plumbing work.

H. Replacing, repairing and refinishing all panels, windows, doors or other items which are a part of the base building, altered or removed to enable the execution of the work under this contract.

1. Demolition - as described in this document.

J. Abatement - as described in this document.

12

NYC-WTC_000154695

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154695Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →