NYC 9/11 Public Portal Document
Asbestos Abatement Technical Specifications
For 130 Cedar Street, New York, NY
5.4 There shall be a sufficient number of trained and qualified workers, foremen
• and superintendents to accomplish the work in accordance with the required
schedule. Since general work cannot start prior to the successful
decontamination of the work area, it is imperative that a sufficient number of
trained personnel be engaged throughout the abatement process. No
untrained, unqualified or unapproved person shall be employed to hasten
completion of the abatement work.
6.0 Owner(s) Responsibilities
6.1 The Owner(s) shall provide the utilities needed by the Contractor to complete
the abatement project. Said utilities shall include electric current to supply
negative air units, vacuums and other equipment needed within the work area
and a water source at every floor.
6.2 The Owner(s) shall provide to the Contractor a list of all daily and emergency
phone numbers needed during the course of the project including but not
limited to fire, police, ambulance and other emergency services.
7.0 Responsibilities of the Environmental Consultant
7.1 The Environmental Consultant shall be hired by the Owner(s) and be
independent of the Contractor on the job.
7.2 All air monitoring specified in the Air Monitoring Section of this Specification
shall be adhered to by the Environmental Consultant.
7.3 The technician on site will make inspections after each stage of the work is
completed to assure proper completion before the next stage begins.
Inspections will take place after plastic enclosure is set up (prior to removal)
and after clean up phase.
7.4 The Environmental Consultant is responsible for daily inspections during all
phases of the removal project to ensure the work is being done properly with
no outside work area contamination.
7.5 The Environmental Consultant has the authority to stop work due to lack of
cooperation by the Contractor, contamination of areas outside the work area,
or any violations of the Specifications, or Federal, State and Local regulations.
7.6 If any inspection fails, the Environmental Consultant shall notify the
Contractor stating the reason for the failure. The Contractor shall correct the
problem and the Environmental Consultant shall perform another Inspection.
This process shall be repeated until the Contractor's work has passed
inspection.
7.7 If any air test exceeds acceptable levels (outside work area, greater than .01
f/cc; or inside work area levels exceeding OSHA standards), the
Environmental Consultant shall notify the Contractor, who shall stop work and
Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 20
NYC-WTC 000125598