NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/DEP Box 50/130 CEDAR STREET
Document / 74 pages

Asbestos abatement technical specifications, 130 Cedar Street, July 2004

Machine-extracted title · confidence 100%

Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125636
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY b. Seal material in a leak tight container while wet and plasticize the • storage area and utilizing negative air filtration.

c. Keep ACW separate from any other waste.

3.9 ACW storage away from the site of generation, the Contractor shall:

a. Ensure that the ACW has been properly packaged as per requirements above.

b. Examine the containers of ACW to ensure that there are no breaks in the containers and that no visible dust is being released into the air.

c. Examine the containers in a manner reasonably calculated to minimize disturbance and damage to the containers.

d. Should examination reveal damage to a container of ACW the Contractor or person accepting the waste shall immediately wet down the ACW and re-package it into clean leak tight containers. The repackaging shall be conducted in a place and manner to minimize potential exposure to the general public. The subsequent repackaging shall be the financial responsibility of the Contractor and occur at no extra cost to the Owner(s).

• 3.10 ACW Disposal:

a. The Contractor shall transport all sealed asbestos containing waste (ACW) to a landfill site approved by the New York State Department of Environmental Conservation (NYS-DEC). Transportation shall be performed by a NYS-DEC registered waste-hauler.

b. The Contractor shall be responsible for maintaining all sealed containers during the processing of bags (i.e. handling, loading, transporting, unloading).

c. At the completion of the project the Contractor shall provide a manifest or dump ticket duly executed by the Contractor, the transporter, and the disposal facility. The manifest shall be all-inclusive, describing the volume of materials, dates of transport and date of disposal. A dump ticket shall be produced for each load.

d. The dumpster that is to receive asbestos material and other refuse from the contaminated area may be located adjacent to the exterior door as selected by the Contractor and approved by the Owner(s).

e. The dumpster is to be of the totally closeable type and is to be kept closed and locked to prevent vandalism. It shall be utilized only for refuse from the asbestos removal area.

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 58

NYC-WTC 000125636

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125636Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →