Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125637
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY f. Disposal shall be at an approved landfill, transfer at a licensed transfer • station and a manifest form will be signed by the landfill owner documenting receipt and acceptance of the ACW.

SECTION NINE: AIR MONITORING, TESTING, AND INSPECTIONS

1.0 Inspection and Testing

1.1 Air sample collection, final clearance Inspections and monitoring of the Contractor's work practices shall be conducted by a certified New York State Project Monitor.

1.2 Air sample analysis shall be conducted by individuals possessing the following professional qualifications:

a. Proficiency (P) Rating In the. NIOSH Proficiency In Analytical Testing Program (PAT).

b. Accreditation by the State of New York Environmental Laboratory Approval Program (ELAP).

c. The analysis staff shall be independent of all parties involved in the asbestos project.

2.0 Personal (OSHA) Monitoring

2.1 At the end of the project the Contractor shall provide complete documentation of the OSHA required monitoring of on-site personnel that was conducted during the abatement activities. This information will document the worker exposure on this particular project.

3.0 Monitoring Requirements

3.1 Prior to the commencement of large project abatement activities the work area shall be pre-tested to determine ambient airborne asbestos levels. A minimum of five (5) inside the work area and five (5) outside the work area samples shall be collected throughout the proposed work area during normal occupancy activities and circumstances.

3.2 The following conditions shall determine the minimum number of air samples to be collected on a daily basis at the large project work site:

a) Four (4) samples within ten (10) feet of isolation barriers.

b) One (1) sample at the exhaust of each air filtration device (microtrap) exhausting Indoors on the project.

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 59

NYC-WTC 000125637

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125637Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →