Asbestos Abatement Technical Specifications
For 130 Cedar Street, New York, NY
Note: Any penalties incurred for failure to comply with any of the above
• regulations, will be the sole responsibility of the Contractor and his Sub-
Contractors. The Owner(s) claims no responsibility for fines imposed due to
the negligence of the Contractor.
3.2 Keep ACW separate from any other waste.
3.3 Keep ACW in a secured, enclosed and locked container.
3.4 If the Contractor has the intention of storing a quantity ACW greater than or
equal to 50 cubic yards, the Contractor shall submit a written request and
receive written approval from the Owner(s).
3.5 Prior to transport the Contractor shall:
a. Ensure that ACW has been sufficiently wet down.
b. Examine the integrity of the container's airtight seals.
C. Re-wet and re-package any damaged containers.
Ensure that the person transporting asbestos waste holds a valid
permit issued pursuant to New York State regulations.
3.6 Transport of ACW
a. Ensure that the ACW has been sufficiently wet down in a leak tight
container.
b. Examine the integrity of the container's leak tight seal at a minimum of
once per 24-hour period.
c. Re-wet and re-package any damaged containers.
d. Maintain at storage site an adequate supply of spare leak tight
containers.
e. Maintain at storage site an adequate supply of amended water.
f. Keep ACW separate from any other waste.
g. Keep ACW in a secured, enclosed and locked container.
3.7 The Contractor or Sub-Contractor at the time of presenting for disposal
of ACW shall comply with all applicable NYC DEP and NYS-DOL regulations
issued pursuant to asbestos disposal.
3.8 For storage in the generation site:
a. Wet down all ACM waste in a manner sufficient to prevent all visible
emissions of dust into the air.
C]
Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 57
NYC-WTC 000125635