Technical specifications document prepared for asbestos abatement work at the 130 Cedar Street site.

NYC-WTC_000125579–000125652

Folder label: “130 CEDAR STREET

Page image
Scanned page image, NYC-WTC_000125600
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Abatement Technical Specifications For 130 Cedar Street, New York, NY site must be submitted to show that the facility handles asbestos waste and • is registered with the applicable regulatory agencies.

9.2 Labels are required on containers of ACM waste materials indicating the name of the waste generator and the location where the waste was generated.

9.3 The Contractor shall be responsible for ensuring that all such sealed containers are not ruptured during processing, including packaging, handling, loading, transporting and unloading. Any containers that are found to be ruptured upon arrival at the landfill shall be re-containerized by the Contractor immediately.

9.4 Upon completion of the project the Contractor shall provide a manifest or dump ticket, duly executed by the Contractor, transporter and disposal facility. The manifest shall be all-inclusive, describing volume of materials, dates of transport and date of disposal. A dump ticket shall be produced for each load.

9.5 The dumpster that is to receive asbestos material and all other refuse from the contaminated area is to be located adjacent to an exterior door as selected by the Contractor and approved by the Owner(s).

9.6 The dumpster is to be of the totally dose-able variety and shall be kept closed and locked to prevent vandalism, and so that it is available only for the refuse from the asbestos removal area.

10.0 Contract Close-Out

10.1 The certification of final completion shall not be issued until the following conditions have been satisfied:

a. A final inspection by the Environmental Consultant reveals that no visible ACM exists in the designated work areas.

b. All inspections required by this Specification are passed.

c. Final air clearance tests indicate airborne asbestos fiber levels of less than 0.01 f/cc.

d. The Contractor submits copies of the results of OSHA personal monitoring.

e. The Contractor submits all required disposal documentation.

f. The Contractor has removed all debris, rubbish, tools, surplus materials, temporary buildings and temporary works from the work areas.

Prepared by JLC Environmental Consultants, Inc. Project No. 04-3271 Page 22

NYC-WTC 000125600

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000125600Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000127738 · Box DEP Box 52

Health and safety plan for Phase I deconstruction at 133-135 Greenwich Street and 21-23 Thames Street dated June 8, 2005.

Cited alongside this record in an Ask answer

Compare copies and versions →