Asbestos project notification form for NYC DEP

Machine-extracted title · confidence 95%

Application form submitted to the Department of Environmental Protection for notification of an asbestos inspection project.

NYC-WTC_000154680–000154700

Folder label: “Buildings 105 Duane 80 John Gateway etc. 75 Park 200 Rector Trinity Church

Page image
Scanned page image, NYC-WTC_000154692
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

remain in place. As each floor is cleared visually it will be sealed off from all personnel except to perform final air sampling.

3. GENERAL CONDITIONS A. All clean-up shall be performed utilizing the procedures as required by NYCDEP Title 15, NYSDOL ICR 56 and in accordance with all other applicable federal, state and local regulations. All ACM shall be wetted using amended water prior to removal.

B. Water hookups to be provided by the Abatement Contractor and to be coordinated with the Client.

C. Contractor shall deliver sufficient ground fault interrupt service (GFI) panels to the site. Panels shall meet the requirements of applicable provisions of the National Electric Code. The panels shall be connected by the on-site electrical contractor. The on-site electrical contractor shall be responsible for any and all standby electrician costs as required by the Scope of the Work. The contractor shall assure that all full-containment areas shall be equipped with sufficient temporary GFI electrical and lighting installation to accommodate the Scope of the Work as indicated in this document, including all air sampling outlets.

D. The Abatement Contractor shall provide temporary lighting in all Work Areas, decontamination units and staging areas for the duration of the project shall maintain temporary lighting and circuits. All temporary lighting shall be GFI service. In addition, all air sampling locations shall be provided with temporary lighting and power as per the Environmental Consultant’s requirements.

E. All waste to be transported shall be doubled-bagged and properly labeled.

F. Work hours will be confirmed by the Client. Nominal work hours are 24 hours a day, seven days a week.

G. All footage calculations and conditions are approximate and must be verified on site by the Abatement Contractor.

H. The Abatement Contractor shall be responsible for all city, state and federal filings (including variances) and associated fees.

4. MATERIALS AND EQUIPMENT A. General:

9

NYC-WTC_000154692

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000154692Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →