SECTION 02082
Documents.
6. The Contractor shall be responsible for and shall include in its Bid any and all fees or
changes imposed by Local, State or Federal Law, Rule or Regulation applicable to the
work specified herein, including fees or charges which may be imposed subsequent to the
date of the Bid opening.
7. Removal of ACSM shall be in accordance with large project full containment
procedures as described in NYC DEP Title 15, Chapter 1, Subchapter F and Section
4.01 of these Specifications.
8. A variance for utilizing tent procedures, as described in Section §1-106 of Title 15,
Chapter 1 and Section 4.02 of these Specifications, within the Work Areas shall be
applied for and approved by NYCDEP prior to the start of abatement activities.
The following variances to Title 15, Chapter 1 shall be included within the variance
request:
a. In lieu of hardwood barriers, the Work Area shall be enclosed with
construction tarpaulin which will enclose the exterior of the entire
scaffolding system;
b. At street level Work Areas, a hardwood vision barrier shall be constructed.
This vision barrier shall be installed to separate the Work Area(s) from the
general public and shall be positioned to enclose and secure the Work
Area(s) and area between the Work Area(s) and decontamination unit.
These barriers shall be constructed of 4 foot by 8 foot plywood sheeting of
minimum thickness of 3/8 inch. The plywood sheeting shall be fastened and
supported by 2 inch by 4 inch wood or metal framing, 16 inch on center;
c. Tent containments shall be utilized for all Work Areas, including those in
which more than 160 square feet of material is being removed;
d. Two layers of 6-mil polyethylene sheeting shall be used for tent construction;
e. During abatement air samples shall be collected and shall be analyzed as
final clearance air samples. The results of these analyses will be used as
clearance results for reoccupancy;
f. The pre and post-abatement waiting/settling periods shall be waived and
breakdown shall commence once final clearance air monitoring (during
samples) results are determined to be satisfactory; and
g- The air filtration devices (AFDs) shall be exhausted locally and the
requirement of exhausting at least 40 feet from all openings, intakes, etc.
shall be waived. All openings, intakes, etc. within twenty-five feet of the
Work Area will be sealed with two layers of polyethylene sheeting.
h. Air monitoring procedures shall be altered as follows:
(1) During abatement air samples shall be analyzed as final clearance air
samples.
(2) During abatement air samples shall be collected in the following
locations:
(a) One side-by-side PCM and TEM air sample shall be collected
in each classroom which is adjacent to a Work Area;
(b) One PCM air sample shall be collected in each corridor which
02082-4